My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
121
>
2300 - Underground Storage Tank Program
>
PR0543446
>
INSTALL 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2019 10:52:47 AM
Creation date
1/16/2019 2:16:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2019
RECORD_ID
PR0543446
PE
2351
FACILITY_ID
FA0024656
FACILITY_NAME
7-ELEVEN #38153
STREET_NUMBER
121
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
121 S CENTER ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL ' II � I �7 <br /> TIO 7 <br /> CERTIFICATION CERTIFICATION <br /> THIS CERTIFICATE IS ISSUED IN RECOGNITION THAT THIS CERTIFICATE IS ISSUED IN REC06NITION THAT <br /> Jessie D. Andrada David Delgado <br /> HAS SATISFACTORILY COMPLETED HAS SATISFACTORILY COMPLETED <br /> Phase 1 UST Enhanced Vapor Recovery Phase 1 UST Enhanced Vapor Recovery <br /> (Installation,Configuration&Troubleshooting) (installation,Configuration&Troubleshooting) <br /> Dec 31,2016 100574 Jan 01,2019 Dec 31, 2016 100562 _ Jan 01,2019 <br /> ISSUE OIn TICH MUMIEI EIIIIITIII 111E IISUE DATE TECH NAME ITINIATIOM DATE <br /> `ajUNIValTY � � - C:30 1="ws <br /> `��UNIVERSITY � <br /> TECHNICAL ' I TECHNICAL ' I <br /> CE <br /> I I CERTIFICATION <br /> THIS CERTIFICATE IS ISSUED IN RECOGNITION THAT THIS CERTIFICATE IS ISSUED IN REC06NITION THAT <br /> Juan Delgado Rafael Flores <br /> HAS SATISFACTORILY COMPLETED HAS SATISFACTORILY COMPLETED <br /> Phase 1 UST Enhanced Vapor Recovery Phase 1 UST Enhanced Vapor Recovery <br /> (Installation,Configuration&Troubleshooting) (installation,Configuration&Troubleshooting) <br /> Dec 31,2016 100579 Jan 01, 2019 Dec 31,2016 0154737 Jan 01,2019 <br /> ISSUE NAR TECH NUNDER IIIIIITION OIIE ISSUE DATE TECH MITI EIAl1A1IUM SIT <br /> `,UNIVERSITY 6 W `96NIVERSITY o_Pws <br />
The URL can be used to link to this page
Your browser does not support the video tag.