Laserfiche WebLink
STI SP001 Annual Inspection Checklist <br /> General Inspection Information : <br /> Inspection Date : J.2 & Retain Until Date : liffla �f (36 months from inspection date) <br /> Prior Inspection Date : Inspector Name : /.d� 90_ <br /> Tanks Inspected ( ID #'s) : //� �1,� /l9 2U �/Tj'�� /� /� �96 3 <br /> Inspection Guidance : <br /> ➢ For equipment not included in this Standard , follow the manufacturer recommended inspection/testing schedules and procedures . <br /> ➢ The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure . This visual inspection does not require a Certified <br /> Inspector. It shall be performed by an owner' s inspector who is familiar with the site and can identify changes and developing problems . <br /> > Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area , interstice , or spill container. Before discharge to the <br /> environment, inspect the liquid for regulated products or other contaminants and disposed of it properly . <br /> ➢ In order to comply with EPA SPCC (Spill Prevention , Control and Countermeasure ) rules , a facility must regularly test liquid level sensing devices to ensure proper <br /> operation (40 CFR 112 . 8( c) (8) (v) ) . <br /> ➢ (* ) designates an item in a non-conformance status . This indicates that action is required to address a problem . <br /> > Non-conforming items important to tank or containment integrity require evaluation by an engineer experienced in AST design , a Certified Inspector, or a tank <br /> manufacturer who will determine the corrective action . Note the non-conformance and corresponding corrective action in the comment section . <br /> ➢ Retain the completed checklists for 36 months . <br /> > Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> ➢ Note : If a change has occurred to the tank system or containment that may affect the SPCC plan , the condition should be evaluated against the current <br /> plan requirement by a Professional Engineer knowledgeable in SPCC development and implementation . <br /> Item I Task Status Comments <br /> 1 . 0 Tank Containment <br /> 1 . 1 Containment Check for: DYes* Ao ' _i N/A <br /> structure • Holes or cracks in <br /> containment wall <br /> or floor <br /> • Washout <br /> • Liner degradation <br /> • Corrosion <br /> • Leakage <br /> • Paint failure <br /> • Tank settling <br /> 2. 0 Tank Foundation and Supports <br /> 2 . 1 Foundation Settlement or ❑ Yes* )% o <br /> foundation washout? <br /> 2Tri <br /> crete pad Cracking or spalling ? ❑ Yes* XNo uN/A <br /> ng wall <br /> AST INSPECTION STANDARD 7 SEPTEMBER 2011 <br /> COPYRIGHT© 2011 Steel Tank Institute <br />