Laserfiche WebLink
Item Task Status Comments <br /> c. Make sure fusible 1AYes ❑ No* ❑ N/A <br /> element is in place <br /> and correctly <br /> positioned . <br /> d . Be sure test ports XYes ❑ No* [ ] N/A <br /> are sealed with plug <br /> after testing is <br /> complete and no <br /> temporary test fixture <br /> or component remains <br /> connected to valve . <br /> 5 . 3 Interstitial Check condition of AtYes [ ! No* ❑ N/A <br /> leak detection equipment, including : <br /> equipment The window is <br /> clean and clear in <br /> sight leak gauges. <br /> • The wire <br /> connections of <br /> electronic gauges <br /> for tightness and <br /> corrosion <br /> • Activate the test <br /> button , if <br /> applicable , <br /> 5.4 Spill a . If corrosion , ❑ Yes* ANo ❑ N/A <br /> containment damage , or wear has <br /> boxes on fill compromised the <br /> pipe ability of the unit to <br /> perform spill <br /> containment functions , <br /> replace the unit. <br /> b . Inspect the ] Yes* [ No [IN/A <br /> connections to the <br /> AST for tightness , as <br /> well as the bolts , <br /> nuts, washers for <br /> condition and replace <br /> if necessary, <br /> c. Drain valves must [IYes* : No ❑ N/A <br /> be operable and <br /> closed <br /> 5 . 5 Strainer a . Check that the XYes [Wo* ❑ N/A <br /> strainer is clean and in <br /> good condition . <br /> AST INSPECTION STANDARD 10 SEPTEMBER 2011 <br /> COPYRIGHT© 2011 Steel Tank Institute <br />