Laserfiche WebLink
American Biodiesel nA%J Silo S-2 <br /> Stockton,CA g ^?= Out of Service Inspection <br /> 3.0 Summarized Recommendations <br /> Interior of Silo <br /> 1. It is recommended that the entire internal area of the silo, including the nozzles and manway, be <br /> thoroughly cleaned to remove all scale and residual product build up. This cleaning should be completed <br /> prior to placing the tank in service. <br /> Nozzles <br /> 2. The manway cover was found to be severely corroded and in overall poor condition. It is recommended <br /> that this cover be replaced prior to placing the tank back in service. <br /> Inspectors Signature: /Ija'a' <br /> Gera d len API 653 Certification No. 28542 <br /> Report Date Petroleum&Refractory, Inc. Page 5 of 21 <br /> February 27,2007 TankReporter 13.91 <br />