My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PESCADERO
>
800
>
2800 - Aboveground Petroleum Storage Program
>
PR0528616
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 11:49:59 AM
Creation date
1/17/2019 8:43:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0528616
PE
2832
FACILITY_ID
FA0018371
FACILITY_NAME
MCLANE FOODSERVICE DISTRIBUTION
STREET_NUMBER
800
STREET_NAME
PESCADERO
STREET_TYPE
AVE
City
TRACY
Zip
95304
APN
21307066
CURRENT_STATUS
01
SITE_LOCATION
800 PESCADERO AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 102: <br /> 112.8(a) Discharge prevention and containment are discussed pages 11, 13,15,20 <br /> 112.8(b) Facility Drainage discussed page 13 <br /> 112.8Lc JBulk Storage Containers 13 <br /> Item 301: <br /> The referenced oil tank over 100 gallons is not in service. McLane will remove it and the other 2 100 gallon tanks since <br /> they are not in use.The referenced generator allegedly having a tank larger than 55 gallons is not in use and has been <br /> labeled as such. 15,000 gallon ASTs changed to "single wall". <br /> Item 601: <br /> Added reference to 112.7(g) below security description on page 10. Added references to 112.8(a) and 112.8(b). <br /> Item 603: <br /> Added reference to diagram to "See following Page 20 for details". Added piping to the diagram. <br /> Item 604: <br /> The plan specifically lists each container, etc. on page 20. <br /> Item 609: <br /> Reporting procedures discussed on Page 14. Added CUPA's phone number on page 14. <br /> Item 612: <br /> Tanks in "maintenance building" do not belong to McLane and were removed from the plan.The "sewer" drain is sealed. <br /> The three smaller tanks at the fuel island are not in use and will be removed from the fuel island.They have been <br /> removed from the plan. 15,000 gallon ASTs changed to "single wall". <br /> Item 618: <br /> Monthly inspections started 01/31/19. <br /> Item 628: <br /> 112.7(a)(1) specifically discussed on page 10 and included in original cross reference. Added statement "There are no <br /> known more stringent State rules, regulations and guidelines that exceed the requirements of this SPCC Plan" on page <br /> 10. <br /> Item 711: <br /> Integrity tests for Tanks 1 and 2 are planned to be completed during fuel island overhaul. Date TBD. <br /> Item 720: <br /> Piping installed prior to August 16, 2002. <br /> Item 723: <br /> Monthly Inspection form specifically lists "Piping Connections"to be inspected for leaks, Corrosion, or Damage on page <br /> 24.Annual Inspection Procedure includes the following statement at the beginning: "Visually inspect containers for any <br /> indication of the need for repair, maintenance, or replacement including man way gaskets and piping connections" on <br /> page 22. <br />
The URL can be used to link to this page
Your browser does not support the video tag.