My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:28:22 AM
Creation date
1/18/2019 11:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Monitoring Certification Checklist <br /> Store Number : 210997 Address : 1442A COLONY DR. RIPON, CA 95366 <br /> Date : 1/ 17/ 2019 Technician : Jesus Saldivar Company: TANKNOLOGY INC. <br /> T1 :SUPREME T2 : REGULAR <br /> Step Instruction UNLEADED UNLEADED <br /> Product PREMIUM REGULAR <br /> Tank Type Fiberglass Fiberglass <br /> (DW FRP, DW Steel, SW FRP) <br /> 1 Annular Riser Height ( measured ) 63 .00 in. 64 .00 in . <br /> 2 Tank Diameter : (from tank chart, 117 . 75 in. 117 .75 in. <br /> for example: 118. 375 ", 117. 75 ; 111 ",92 ", etc. ) <br /> 3 For FRP tanks, 1/2 circumference of the tank 184 . 87 in. 184 . 87 in. <br /> (0.5 X3. 14 X tank diam.) OR (q.57 x step Z) <br /> Required annular sensor length : <br /> 4 FRP = Riser + 112 Circumference = step 1 + step 3 247 . 87 in. 248 . 87 in. <br /> steel = Riser + diameter = step 1 + step 1 <br /> Mark & label the required sensor length on <br /> 5 sensor cord . Label should be under the cap & Yes Yes <br /> serve to prevent the cord being pulled too short. <br /> Is tank annular sensor in the correct position ? <br /> Yes Yes <br /> FRP Tanks: with the marked required length <br /> 6 lining up with the top of the annular riser? Yes Yes <br /> Steel Tanks : sensor touching bottom with slack <br /> above the marked required sensor length ? <br /> i <br /> Are the DW pipe boots pulled back in tank sumps ? <br /> 8 (YIN or N/A, note if can 't be verified because Yes Yes <br /> clamshell pointing down) <br /> Are tank sump sensors back in their holders and <br /> 9 in the correct position ? Yes Yes <br /> (YIN or N/A document with photo) <br /> 7 Approximate gallons of product dispensed for <br /> purging, etc . and returned to tank <br /> Has the Veeder Root Battery been replaced & dated prior to failsafe ? Replaced Today <br /> (if battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) <br /> Has Veeder Root Programming before & after testing been printed & verified ? Yes <br /> (especially tank manifolding setup - see Note 2) <br /> Has Veeder Root Programming before & after been attached to the Work Order? Yes <br /> Have all sensor model numbers been verified against the Veeder Root cord label ? <br /> Yes <br /> Make a note if sensor label missing or illegible, & approx. cord length for -208/-209 with missing labels <br /> Additional Comments : <br /> Note 1: Certain Veeder Root Software versions will automatically revert to the default tank manifold settings anytime the programming is changed, such as when sensors are <br /> temporarily X'ed out, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.