My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:28:22 AM
Creation date
1/18/2019 11:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q U I N Environmental Health Department <br /> Linda Turkatte , REHS , Director <br /> COUNTY <br /> Kasey Foley, REHS , Assistant Director <br /> )PO Greatness grows here . <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Michael Kith , REHS <br /> December 17 , 2019 Melissa Nissim , REHS <br /> Liddy McKenzie <br /> Gettler Ryan Inc . <br /> 6805 Sierra Court , Suite G <br /> Dublin , CA 94568 <br /> Re : Chevron #210997 SR0081274 <br /> 1442 Colony Rd . , Ripon , CA 95366 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to : - replace all UDCs & dispensers , - replace turbines & leak detectors , - replace <br /> flex connectors , - replace sump & UDC sensors , -cold start the monitoring panel , on the underground <br /> storage tank ( UST) system at the above noted address . The permit has been approved with the <br /> following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Shewit Woldearegay at (209) 468-0216 to arrange the following inspection <br /> appointments (a 48 - hour notice is required for inspection appointments) . Please be aware that <br /> inspections for emergency work must be scheduled within five days of permit approval . <br /> a . Primary piping soap test of all piping and penetrations ( product , vapor recovery , and <br /> vent) : One - hour pneumatic pressure test at 110 % of operating pressure , or 40 psi , <br /> whichever is greater , in accordance with manufacturer installation instructions . <br /> b . Secondary piping soap test of all piping and penetrations ( product , vapor recovery , and <br /> vent) : One- hour pressure test at the manufacturer' s recommended specification . <br /> c . Integrity testing of all UDCs , per the manufacturer' s installation instructions , prior to <br /> backfill . <br /> d . Verification of the dispenser footprints contained by the UDCs . Any potential leaks from <br /> piping and fuel filters must drain directly into UDCs . <br /> e . Leak detector test , after first fuel delivery : Leak detector must be tested to confirm that <br /> the device can detect a leak of 3 gallons per hour at 10 psi . Leak detector monitored line <br /> volumes shall be appropriate for the make and model of the installed leak detectors , and <br /> shall be verified at the time of installation . <br /> f. Monitoring system functionality , after first fuel delivery , in operating condition : <br /> Functionality of the monitoring system must be verified to ensure it meets the <br /> requirements of CCR Title 23 and HSC Chapter 6 . 7 . <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 T 209 468-3420 F 209 464 -0138 1 www . sjgov . org /ehd <br />
The URL can be used to link to this page
Your browser does not support the video tag.