My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 10:28:22 AM
Creation date
1/18/2019 11:55:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95366
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES [ ] NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component , describe how this will be done . ( If <br /> adding piping , UDC ' s , or other UST equipment , or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> REPLACE ALL (6 ) DISPENSERS WITH NEW MULTI -GRADE GILBARCO DISPENSERS WITH NEW HANGING HARDWARE . <br /> REPLACE ALL EXISTING UDC'S WITH NEW DOUBLE WALLED UDC'S WITH NEW BRAVO PENETRATION FITTINGS . <br /> REMOVE AND REPLACE EXISTING CONCRETE AND IMPACTED BOLLARDS DUE TO REPLACEMENT OF UDC' S <br /> INSTALL NEW RED JACKET TURBINES/ PLLD ' S AND BALL VALVES/ FLEX CONNECTORS <br /> INSTALL NEW VR-209 SUMP SENSORS IN ALL TANK SUMPS . INSTALL NEW 208 UDC SENSORS . <br /> I <br /> PERFORM COLD START OF TLS-350 AND PURGE , CALIBRATE AND START UP SYSTEM AND ALL TESTING <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third -party approval) : <br /> GILBARCO ENCORE 700 SERIES 3 + 0 DISPENSERS WITH HANGING HARDWARE <br /> RED JACKET 2 HP TURBINES WITH NEW VEEDOR ROOT PLLC # 8484480 <br /> BRAVO PENETRATION FITTINGS F - Series - D various sizes <br /> VEEDOR ROOT 208 AND 209 SENSORS <br /> BRAVO D /W UDC ' S 88000 - 13 - D -AM- EE - 08 <br /> FRANKLIN FUELS FLEX CONNECTORS <br /> JOMAR BALL VALVES <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.