My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
13520
>
2900 - Site Mitigation Program
>
PR0527550
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 8:25:02 PM
Creation date
1/18/2019 4:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527550
PE
2950
FACILITY_ID
FA0018662
FACILITY_NAME
COS DELTA WTR SUPPLY INTAKE PRJCT
STREET_NUMBER
13520
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
NONE
CURRENT_STATUS
01
SITE_LOCATION
13520 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CDM/DWSP Request for Conditional Permit is Page 1 of 2 <br /> Adrienne Ellsaesser [EH] <br /> From: Timothy O'Brien [tobrien@waterboards.ca.gov] <br /> Sent: Thursday, September 23, 2010 1:49 PM <br /> To: Mark Andrews; Robert.Granberg@ci.stockton.ca.us;Adrienne Ellsaesser[EH] <br /> Cc: Chad Brown; Paul Meyerhofer; Doug Heard; Cliff Raley <br /> Subject: Re: CDM/DWSP Request for Conditional Permit <br /> Attachments: Granberg 25 May 2010.PDF; Obrien 23 Sept 2010.PDF <br /> Mr.Andrews, <br /> Based on the information contained in your 23 September 2010 letter(attached), dewatering activities within the <br /> area defined by a 1,000 foot radius of the pipeline right angle located near Herman and Helen's Marina,will <br /> cease on 24 September 2010. At that point, continued monitoring of the piezometers is no longer required. I <br /> have also reviewed the 21 September 2010 well destruction workplan prepared by Kleinfelder and have <br /> determined the well destruction technique is acceptable. Please employ adequate means to ensure the lead <br /> auger doesn't wander off the well casing when drilling out the wells. <br /> By this e-mail I'm notifying Ms. Ellsaesser of the San Joaquin County Environmental Health Department that the <br /> Regional Board has no objection to issuing the well destruction permits for the work to occur after September 27 <br /> 2010. Please submit a well destruction report within 30 days of the wells being destroyed. <br /> If you have any questions on this information, please contact me. <br /> Tim, <br /> Per our conversation, please find our attached letter of request for your conditional approval to allow the County <br /> permit to be issued to Klienfelder to complete the DWSP piezometer well abandonment as needed. <br /> Thank you for your help in this matter. <br /> Mark Andrews <br /> Principal <br /> Sr. Construction P.M. (Pipelines) <br /> CDM Constructors Inc. <br /> Stockton Delta Water Supply Project <br /> 11374 Lower Sacramento Road <br /> Lodi, Ca. 95242 <br /> Ph: (209)365-4623 <br /> Fax: (209)365-4639 <br /> Cell: (562)254-3925 <br /> Timothy R. O'Brien <br /> 9/23/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.