Laserfiche WebLink
E/NFELOER <br /> engne v.av�a.xisne mwrto:. <br /> 1.7. REPORTING <br /> Upon completion of the field activities, Kleinfelder will prepare a Dewatering Test Well <br /> report. The report will include boring logs, well development logs, sieve analysis, <br /> pumping test results (e.g., drawdown, specific capacity, hydraulic conductivity, <br /> transmissivity), and boring permits. <br /> 87057/ST09L024 Page 6 of 7 January 28, 2009 <br /> Copyright 2009 Kleinfelder <br />