Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page I of 1) <br /> Type of Action ❑Installation Inspection ❑Repair Inspection R]36 Month Inspection <br /> I. FACILITY INFORMATION <br /> CERS ID Dale of Overfill Prevention Equipment Inspection <br /> 1/22/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Arco 6080 <br /> Business Site Address City ZIP Code <br /> 85 E. Louise Ave Lathrop 95330 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection(Print as shown on the ICC Certification) Phone# <br /> David Rouse (925) 551-7555 <br /> Contractor f Tank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 220793 8292530 6/28/2019 <br /> Overfill Prevention Equipment Inspection Training and Certifications(List applicable certificalions) <br /> N/A <br /> ill. OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑Manufacturer Guidelines(Specify) <br /> Used <br /> ❑Q Industry Code or Engineering Standard(Specify) Tank Chart, Veeder Root, Tape Measure <br /> ❑Engineered Method(Specify) <br /> Attach the inspection procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product.etc) T1 Unleaded T2 Premium T3 Diesel <br /> What is the tank inside diameter?(Inches) 119.60 119.60 119.60 <br /> Is the fill piping secondarily contained? 0 Yes ❑No Q Yes ❑No Yes ❑No ❑Yes ❑No <br /> is the vent piping secondarily contained? 0 Yes ❑No 0 Yes ❑No [E Yes ❑No ❑Yes ❑No <br /> Overfill Prevention Equipment Manufacturers) Veeder Root Veeder Root Veeder Root <br /> What is the overfill prevention equipment response ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow ❑Shuts Off Flow <br /> when activated? <br /> (Check all that apply.) ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow ❑Restricts Flow <br /> 0 AfV Alarm I]AIV Alarmx❑AIV Alarm ❑A/V Alarm <br /> Are flow resinctors installed on vent piping? ❑Yes []No ❑Yes i]No ❑Yes 2 No ❑Yes ❑No <br /> At what level in the tank is the overfill prevention set <br /> to activate?(Inches from bottom of tank) 100 1/8" 99 1/2 991/4 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 90 % 90 % 90 % <br /> Is the overfill prevention in proper operating condition ❑x Yes ❑x Yes ❑x Yes ❑Yes <br /> to respond when the substance reaches the <br /> appropriate level? ❑No(Specify in V.) ❑No(Specify in V} ❑Noecif S <br /> ( p y in V) ❑No(Specify in V) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results 0 Pass ❑Failx❑Pass x❑Fail I ❑Pass ❑Fail ❑Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fail"must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS INSPECTION <br /> I hereby certify that the overfill prevention equipment was inspected in accordance with California Code of Regulations,Title 23, <br /> Division 3,Chapter 16,Section 2637.2 and all the WormaMin contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components fh this form accommodates,additional copies of this page maybe attached. <br /> CERS=Caldonia Erm4orvrnenlal Reportng System,ID=Identification.UST=Underground Storage Tank,ICC=irdemabonaf Code Council.AN=Audible and Visual <br />