My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 11:44:33 AM
Creation date
1/25/2019 1:53:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Epp GR Job# 19200023 <br /> �g44mjyg <br /> v�4p�an <br /> Emergency Shut-Off (ESO) Testing Results & Checklist <br /> Facility Information Contractor Information TEST Results <br /> Site#Arco 6080 Co Name. Gettler-Ryan 1 _ Date:1/22/2019 <br /> Address: Phone 925-551-7555 <br /> 85 E Louise Ave Lead Technician:David Rouse PASS <br /> CityfSt:Lathro CA Name. or <br /> eMaint.W.O.# 10212-744 Passport FAIL(Next Day Repair Required) <br /> Si nature <br /> The objective of this test Is to provide assurance that the when the E-Slop switch Is activated,all the fueling system circuits(turbines,and dispensers)are do-energized,and <br /> remain de-energized until they are re-set manually). The test procedures and guidelines shall be in accordance with the E-Stop Testing Process <br /> # The following Information Is to be completed. x T.S.W. <br /> r.. Mo WA <br /> SITE DATA <br /> Number of E-Stop switches 2 <br /> 2 Type of Switch? Push PuC Momentary]— Plain light!Toggle 1X1 Other <br /> (if Momentary type, locate and identify re-set button) In Eiect Room - '— <br /> 3 Type of Turbine Control Relay System(Electrical D,stribution Center) <br /> p Brown Box MR Power Solution n Other J0 Custom Fabricated <br /> 4 Type of Turbine Control Relays Make FE Petro Model MAG VFC <br /> 5 Type of Line Leak Detection: Mechanical ELD/CPT L_ij PLLD <br /> PERFORMANCE TEST <br /> e Does the E-Stop shutdown power to the DISPENSERS X <br /> 7 Does the E-Stop shutdown power to the TURBINES X <br /> 8 Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? X <br /> 9 Are the DISPENSER BREAKERS clearly identified;labeled? X <br /> to Are the TURBINE BREAKERS clearly identified/labe:ed? X <br /> 11 Are all the ESOs accessible and clearly identified I labeled? X <br /> t2 Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? X <br /> 12A If#12 is NO,briefly describe what was wrong <br /> 12B How was it corrected: <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site) The technician MUST notify the <br /> Site Manager of the problem,place an"Out of Sery ce"Tag on the ESO(s). and identify an alternate mean(i.e, locate <br /> circuit panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency) <br /> 12D Elite Customer Solution Center has been contacted for the repair <br /> eMaint.W.O.Ticket# <br /> POSTTEST <br /> 11 Site's fueling system is fully operational x <br /> 12 All equipment secured and any access ports,lids,enclosures are closed x <br /> 13 All safety barricades, and any debris was been removed x <br /> COMMENTS <br /> Submit completed copy with other documentation In E-Maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.