Laserfiche WebLink
6FTTLER-RYAM lxt. <br /> TP-201.1C Form I GR Job # 19200023 <br /> Drop Tube/Drain Valve Assembly Data Sheet <br /> Facility. Arco 6080 Test Company. Gettler-RYan Inc. Test Date. <br /> 1/22/2019 <br /> Address: Test Personnel: <br /> 85 E Louise Ave David Rouse <br /> City: State,Zip Code <br /> Lathrop CA, 95330 <br /> Overfill Prevention Make&Model: Spill Container Make&Model: <br /> Flapper OPW <br /> Date f Last Flow Meter Calibration: Date of Last Pressure Gauge Calibration: <br /> 12/14/18 12/14/2018 <br /> Test Results <br /> Device Type&Product Grade Time to Pressurize 30 Second Flow rate 30-Second Pressure(in. <br /> (CFH) H2O) <br /> 87-A 2 .18 10ml 2. 01 <br /> 87-B 2 .20 10ml 2 . 02 <br /> 91 2 .30 10ml 2 . 04 <br /> Comments: <br /> California Air Resource Board October 8,2003 <br /> TP-201.10, Page 8 <br />