Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 4 of 6) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y I N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, <br /> functionally tested,and confirmed operational? ❑ ❑ <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment mll not interfere with <br /> their proper operation? ❑X ❑ ❑ <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested.and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? a ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitonng system fails to operate or is electrically <br /> disconnected? ❑X ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply) ZSump ZUnder-Dispenser Containment ❑ El ❑ <br /> If alarms are relayed to a remote monitoring station,is all communications equipment(e g,modem)operational? uX' ❑ ❑ <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> ❑Check this box if tank gauging is used only for inventory control.(Do not complete this section.) <br /> ❑Check this box if NO tank gauging equipment is installed.(Do not complete this section.) Y N NA <br /> This section must be completed if in-tank Rauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for D El El <br /> faults. <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally <br /> tested,and confirmed operational? ❑ ❑ <br /> Was accuracy of system's product level readings tested? a ❑ ❑ <br /> Was accuracy of system s water level readings tested? Q ❑ ❑ <br /> Were all probes reinstalled properly? Q ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? Q ❑ <br /> For any answer of"N"above,describe in Section Xl how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Y=Yes.N=No,NA=Not Applicable <br />