Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 5 of 6) <br /> XII. LINE LEAK DETECTOR TESTING <br /> [:]Check this box if line leak detectors(LLD)are NOT installed.(Do not complete this section) Y N NA <br /> This section must be completed if LLDs are installed. <br /> Was a leak simulated to verify LLD performance? <br /> (Check all that apply.) Simulated leak rate verified ❑3 GPH 0 1 GPH ❑ 0 2 GPH ❑ ❑ ❑ <br /> Was the testing apparatus properly calibrated? ❑ ❑ ❑ <br /> For emergency generator lank systems,does the LLD create an audible and visual alarm when a leak is detected? ❑ ❑ ❑ <br /> For mechanical LLDs,does the LLD restrict the flow through the pipe when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off when a leak is detected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ❑ ❑ ❑ <br /> For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? ❑ ❑ ❑ <br /> For electronic LLDs,have all accessible wiring connections been visually inspected for kinks and breaks? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ I ❑ <br /> Were all LLDs confirmed operational within regulatory requirements? ❑ ❑ ❑ <br /> For any answer of"N"above,describe in Section Xlll how and when these issues were or will be corrected. <br /> XIII, COMMENTS <br /> XIV. VACUUM/PRESSURE I HYDROSTATIC MONITORING EQUIPMENT TESTING <br /> X❑ Check this box if VPH monitoring is NOT used. (Do not complete this section) <br /> This section must be completed if VPN monitoring is used to perform leak detection monitoring. <br /> System Type(Mark all that apply.) ❑Vacuum ❑Pressure Q Hydrostatic <br /> Sensor ID Component(S)Monitored By This Sensor Sensor Functionality Interstitial Communication <br /> Test Test <br /> L6 91 STP ❑X Pass Cl Fail ❑X Pass ❑Fail <br /> L7 Diesel STP <br /> Q Pass E]Fail Q Pass ❑Fail <br /> LB 87 Fill Q Pass ❑Fail ❑X Pass ❑Fail <br /> L9 91 Fill X Pass ❑Fail 0 Pass ❑Fail <br /> L10 Diesel Fil ❑X Pass ❑Fail ❑X Pass ❑Fail <br /> L11 87 Annular <br /> Q Pass ❑Fail Q Pass ❑Fail <br /> L12 91/DSL Annu ar ❑X Pass ❑Fail Q Pass ❑Fail <br /> L13 Vent BoxX Pass <br /> ❑ ❑Fail Q Pass El Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail ❑Pass ❑Fail <br /> ❑Pass ❑Fail El Pass ❑Fa:l <br /> ❑Pass ❑Fail ❑Pass ❑Fal <br /> How was interstitial communication verified? ❑Simulated Leak at Far Ends of the Interstitial Space Q Visual Inspection <br /> ❑Other(Describe the method in section XV below) ❑Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑Yes []No(Describe the reason in section XV be.'ow) <br /> For any answer of"Fail'above,describe in Section XV how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH=Gallons Per Hour Y=Yes N=No NA=Not Applicable.VPH=VactiLrWressureh-tydrostaYc.ID=IderrtfiCation <br />