Laserfiche WebLink
San Joaquin County DIRECTOR <br /> PQM'" Environmental Health Department Donna Heran, REHS <br /> .0 ASSISTANT DIRECTOR <br /> 600 East Main Street Laurie Cotulla,REHS <br /> IIIs � Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> • Carl Borgman,REHS <br /> Mike Huggins, REHS, RDI <br /> 01 F o R a\P Website: www.sjgov.org/ehd Margaret Lagorio, REHS <br /> Phone: (209) 468-3420 Robert McClellon, REHS <br /> Fax: (209) 464-0138 Jeff Carruesco, REHS, RDI <br /> Kasey Foley, REHS <br /> OCTOBER 9, 2007 <br /> ATTN: JAY MONNIN <br /> LIONAKIS BEAUMONT DESIGN GROUP, INC <br /> 1919 191h STREET <br /> SACRAMENTO, CA 95814 <br /> RE: LINCOLN ELEMENTARY SCHOOL <br /> 818 WEST LINCOLN ROAD <br /> STOCKTON, CA 95207 <br /> Dear Mr. MONNIN: <br /> This letter will indicate Environmental Health Department approval of drawings <br /> submitted for the proposed "LINCOLN ELEMENTARY SCHOOL" subject to the <br /> following condition(s): <br /> 1. The hot water heater in the kitchen shall have a minimum rating of 60,000 BTU <br /> or 14 kw. <br /> 2. Staff restrooms used by food service employees shall have hot water of at least <br /> 100°F. <br /> You must keep this office informed of the construction progress. An inspection must be <br /> scheduled at least 48 hours in advance when the facility is ready to open with all <br /> equipment installed and thorough cleaning completed. A fee of $ 98.00 per hour may <br /> be assessed for any additional inspections, re-inspections or consultations. <br /> Any item(s) inadvertently overlooked in the plan check process, which is not in <br /> compliance with applicable County Codes and/or State Laws, shall be constructed or <br /> reconstructed upon request of the Environmental Health Department. Inferior <br /> workmanship, equipment, or materials will not be accepted for the construction or <br /> operation of a food facility. Any variance from the requirements outlined in this letter will <br /> require written approval from this Department. Approval of the submitted plans shall <br /> become null and void if the work authorized is not commenced within 180 days from the <br /> date of approval, or the work authorized by such plans is abandoned. In order to renew <br /> - 1 - <br />