My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AURORA
>
635
>
2900 - Site Mitigation Program
>
PR0506770
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:29:18 PM
Creation date
1/31/2019 1:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506770
PE
2950
FACILITY_ID
FA0007617
FACILITY_NAME
HICKINBOTHAM BROS (FORMER)
STREET_NUMBER
635
Direction
S
STREET_NAME
AURORA
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14730004
CURRENT_STATUS
01
SITE_LOCATION
635 S AURORA ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> L <br /> Page 8 . <br /> PLRSOMIRL <br /> 5.0 Personnel: <br /> 5.1 Project Manager <br /> -- Manages field operations <br /> - Ensures the work Pian is completed on schedule <br /> - Briefs the field teams on their specific assignments <br /> l - Participates in the preparation of the Site Safety Plan <br /> - Serves as a liaison with public officials . <br /> 5.2 Site Safety Officer <br /> -- Implements and enforces the SSP <br /> - Assures that all on-site personnel have received a copy <br /> of the SSP, have read it and understand it <br /> - Conducts frequent inspections of site conditions, <br /> facilities, equipment, and activities to determine if <br /> the SSP is adequate and being followed/ <br /> - Conducts daily "tailgate" meetings to explain the plan <br /> of work for the day, mention potential hazards of the <br /> site <br /> Ensues that protective clothing and quipemtn are <br /> properly stored and maintained <br /> Knows emergency procedures, excavation routes, and <br /> notifies local emergency services when necessary <br /> - Notifies the Health and Safety Manager of all accidents <br /> and injuries that occur on site. <br /> L 5.3 On-Site Personnel: <br /> - Are required to document their full understanding of <br /> the SSP before starting work by signing that they have <br /> read the SSP and understand it <br /> - Complies with the SSP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.