Laserfiche WebLink
{ p <br /> ru <br /> Sparger �3 ii�� Analytical Laboratory Division <br /> Mobile Laboratory Division <br /> TechnologyInc. � e Scientific Division <br /> ' With Automation in Mind <br /> Metal, (STLC) <br /> LCS 1 LCSD Recoveries <br /> Attention: Mr. Kevin McKibben Date Sampled: J'u1. 16, 1993 <br /> Geological Audit Date Received: Jul. 16, 1993 <br /> 1803 W, March Lane, Suite A Date Analyzed: j Aug. 2, 1993 <br /> Stockton, CA 95207 Date Analyzed: Aug. 9, 1993 <br /> E Project #E: Project.Name: Pacific Plumbing <br /> i <br /> t � I <br /> Client ID: LCS/LCSD LAB ID: S 1 93-08-009 LCS <br /> ST93-08-009 LCSD ,' <br /> Matrix: Soil Dilution: <br /> i <br /> Units : (mg/L1 <br /> Spike LCS % LCSD % % <br /> Element Conc. LCS Recovery LCSD Recovery RSD <br /> p <br /> Lead (Pb) 5.0 4.3 86.0% 4.9 I� 98.0% 13% <br /> ppm=parts per million a mg/L =milligram per Liter Ik { <br /> ND =Not Detected. Compound(s)may be present at concentrations below the detection limit. !p <br /> �f <br /> k <br /> Aug. 9, 1993 <br /> R. L.Jamas, Principal Chemist Date Reported <br /> SPARGER TECHNOLOGY ANALYTICAL LABORATORY,INC.IS CERTIFIED BY THE STATE DF CALIFORNIA <br /> DEPARTMENT OF HEALTH SERVICES AS A HAZARDOUS WASTE TESTING LABORATORY <br /> (Certification No.1$141 <br /> �I <br /> li <br /> 9[ <br /> 3050 Fite Circle, Suite 112 • Socromento, California 95827 •i (916 362-8947 • FAX(916) 362-0947 <br />