Laserfiche WebLink
- State VV titer Resources Controoard <br /> Division of Clean Water Programs',LL <br /> Winston H.Hickox 2014 T Street•Sacramento,California 95814-(916)s<TECHPH6N6) �- <br /> Secreta Mailing Address: P.O.Box 944212-Sacramento,California•94244-2120 Gray Davis <br /> Secretary.for FAX(916)227-4530-Internet Address: http�/iwww.iwfcb:C'a.foo/--cc+F IN pri.2� Governor <br /> Environmental - L U <br /> Protection <br /> August 24, 1999 <br /> Jess Cervantes <br /> Jess Cervantes Inc. <br /> P O Box 6008 <br /> Stockton, CA 95206 <br /> PRE-APPROVAL OF CORRECTIVE ACTION COSTS, CLAIM NO. 008509, <br /> SITE A DD REV SS- 1207 AURORA ST S, STOCKTON, CA 95206 <br /> I have reviewed your request, received on July 29, 1999, for pre-approval of corrective action <br /> costs; I will place these documents in your file for future reference. I have included a copy of the <br /> "Cost Pre-Approval Request" form; please use this form in the future for requesting pre-approval <br /> of corrective actions costs. <br /> With the following provisions, an additional$9121 is pre-approved as eligible for <br /> reimbursement for drilling and installation of two deep well monitoring wells with conductor <br /> casings as requested by the San Joaquin County EHD (County) in their 07/27/99 letter. This is in <br /> addition to the previous pre-approval dated 12/16/98 in the amount of$9754. The total amount <br /> approved for payment through request number 3.0 for work at your site that has been directed <br /> and approved by the County is $ 24,056. <br /> Be aware that this pre-approval does not constitute a decision on reimbursement: all <br /> reasonable and necessary corrective action costs for work directed and approved by the County <br /> will be eligible for reimbursement per the terms of your Letter of Commitment at costs consistent <br /> with those pre-approved in this letter. <br /> All future costs for corrective action must be approved in writing by Fund staff. <br /> Future costs far corrective action must meet the -requirements of <br /> Article 11, Chapter 16, Underground Storage Tank Regulations. <br /> • The actual costs and scope of work performed must be consistent with the pre-approval for it <br /> to remain valid. <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • If a different scope of work becomes necessary, then you must request pre-approval of costs <br /> on the new scope of work. <br /> California Environmental Protection Agency <br /> �� Recycled Paper <br />