Laserfiche WebLink
Fib-18-99 13 :O1A P�i�t�r Crosby 209 748 5437 P.04 <br /> i <br /> 5 LABORATORY A ALY IS <br /> TPHg&d JBTEX 8020 Soil Samples Each 8.0 $100.00 q$2.000.00 <br /> TPH &d/BTEX 8020 Water Samples Each 2 0 $140A0 <br /> Petroleum Oxygenates Soi!Sam les Each 7. 8.Q $100.00 $ <br /> Petroleum Oxygenates Water Samples Each 2.p $100,00 <br /> Task 5 Subtotal <br /> 6 INVESTIGATION REPORT Re En /Geo Hours + 1.0 $75.00 Additonal Re rt Time En /Geo Hours 2.4 $65.00 AutoCAD Draft Hours ". 2.0 345.0() <br /> Clerical Hours 1.0 $30.00 $3000 <br /> Task 6 Subtotal ii_ $325.00 <br /> PROJECT TOTAL $9.734.10 <br /> I <br /> t <br /> f <br /> I . <br /> f <br /> JJIN GEOSCIENCES Inc. <br />