Laserfiche WebLink
A) Total Or anic Va2rs <br /> A direct reading photoionization detection (PID) meter (HNU K 1 <br /> or equivalent) will be used to monitor the concentrations of organic <br /> vapors in the or�c area. Measurements will be taken at least once <br /> g surface and subsurface sample collection. <br /> every 15 njinutes darin <br /> The meter till tie calibrated for benzene. Total organic <br /> srof <br /> measurements will be used to determine the appropriate <br /> respiratory protection and condition9 for site evacuation. Total <br /> organic vapor concentrations in the workers pgradebreathifrom olevel Dxtos, <br /> '; . of 10 ppm above background will trigger �n upgrade <br /> level C protection. Breathing ite untilzone ctheeworktions in <br /> zone concentrationsexcess of are <br /> ppm will stop the work on <br /> reduced to below 250 Ppm. <br /> C , <br /> I;MPIAYEC TRAINING AND INFORMATION <br /> All personnel working nave completed the certified 40 hour Osha hazardous <br /> waste training course, and have been trained in the following objectives: k <br /> : ential hazards they <br /> a Workers are aware o`' <br /> may encounter. <br /> o' Knowledge and skills necessary to perfor the <br /> + .: work with minimal risk to works health and safety. <br /> r plan and <br /> o Familiarization with the Site Safety <br /> site-specific requirements. <br /> ;•. <br /> The training plan for this site encompasses: } <br /> Potential <br /> physical and chemical health hazards. <br /> o Pote <br /> a Respiratory protection, rationale, use, maintenance <br /> and fit testing. <br /> o Protective clothing, use and maintenance. <br /> ,.' o Entry, exit and decontamination procedures. <br /> o Documentation and record keeping procedures. <br /> ,E <br /> F <br /> R ' <br /> !• r <br /> ` ; x <br /> t <br />