My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012550
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
851
>
3500 - Local Oversight Program
>
PR0544084
>
ARCHIVED REPORTS XR0012550
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 4:45:32 AM
Creation date
1/31/2019 4:31:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012550
RECORD_ID
PR0544084
PE
3500
FACILITY_ID
FA0005447
FACILITY_NAME
LODI READY MIX & BLDG MATERIAL
STREET_NUMBER
851
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
851 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin Local Health District BE: Re-Excavation/Resarnple Work Plan <br /> April 4,_1990 T PaEe_2—of 2 Site: Lodi Ready Mix <br /> - — H51 E. Lodi Ave. , Lodi, CA <br /> - 5. Laboratory that will collect soil samples: FCL <br /> A signed "Release of Information Authorization" is attached. <br /> fi. Remediation Steps: At this time we propose to re-excavate an area 5 feet <br /> on the east and west sides starting from the middle of the excavation, south <br /> to a point 5 feet past the end of the former pump island, a distance of 25 <br /> feat. The excavation will then be 25 feet wide and 25 feet, long. We propose <br /> s- <br /> to excavate to a depth of 22 feet, Hopefully this will remove all of the . <br /> contamination. Soil samples can be taken from the sidewalls and bottom at the <br /> completion of the,excavation. Frir (4) sidewall samples will be taken at a <br /> `j <br /> { depth of 24 feet. Four (4) additional samples will be taken at a depth of <br /> 15 deet, but only analyzed if bottom sidewall samples show contamination. Ont <br /> (1) sample from each wall. Two (2) bottom sanples will be taken at the <br /> direction of San .Joaquin Local Health District Representative. All excavated <br /> g . Soil can stack o r:-1 site at the north end of the property. All soil will <br /> j t. be placed on plastic and covered with same until sampling is done and remediation <br /> or other avenues are discussed and the best solution determined. Diagrams <br /> } <br /> attached snow existing and proposed excavation and sample locations. Piot plan <br /> and proposed spoils pile location. <br /> 7. Timing: Re-excavation/Resample could be scheduled within two to three weeks <br /> t <br /> > following your review and approval of this work plan. The sample analysis <br /> should be i,eady for your review within 4 reeks after they have been taken. <br /> i_ <br />{ <br /> 4+ . { <br /> r <br /> 4•, � i <br /> : <br />
The URL can be used to link to this page
Your browser does not support the video tag.