Laserfiche WebLink
WASTE DISCHARGE REAZEMENTS ORDER NO. 5-00433 7 <br /> THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY <br /> BNSF STOCKTON INTERMODAL FACILITY - <br /> SAN JOAQUIN COUNTY <br /> --- _ 11. Any direct-line discharge to a surface.impoundment shall have fail-safe equipment <br /> or operating procedures to prevent.overfilling. <br /> - 12. The surface impoundment shall be designed,:constructed and maintained to prevent <br /> scouring and/or erosion of the liners and other containment features at points of <br /> discharge to the impoundments and by wave action at the water line.- <br /> -13. <br /> ine.-13. _Leachate removed from a surface impoundment's primary LCRS shall be <br /> discharged to the impoundment from which it originated. <br /> 14. Leachate generation by a surface impoundment to the primary LCRS shall not <br /> exceed design requirements.=If leachate generation exceeds this value, then the <br /> Discharger shall immediately cease the discharge of.waste,excluding leachate,to <br /> the impoundment and shall notify the Board in writing within seven days. <br /> Notification shall include a timetable for remedial action to repair the upper liner to <br /> the impoundment or other action necessary to reduce leachate production. <br /> 15. If leachate is detected in the VZMS of a surface impoundment indicating a leak in <br /> both the primary and secondary liners the Discharger shall: - <br /> a. Immediately cease discharge of waste, excluding leachate to the surface <br /> impoundment until the leaks can be found and repaired, <br /> b. report to the RWQCB that the primary and secondary liners have failed within <br /> 72 hours, - <br /> c. submit written notification of the release to the RWQCB within seven days,the <br /> notification should include a time schedule to repair the primary and secondary - <br /> liners, and <br /> d. discharge of wastes to the surface impoundment will not resume until the - - --- <br /> RWQCB has determined that repairs to the liners are complete and there is no — -- - <br /> further threat to water quality. <br /> 16. Solids that accumulate in the surface impoundments shall be periodically removed <br /> to maintain minimum freeboard requirements and to maintain sufficient capacity for - <br /> surface impoundment leachate and for the discharge of wastes. Prior-to-removal of <br /> these solids,_sufficient samples shall betaken for their characterization and <br /> classification pursuant to Article 2, Subchapter 2, Chapter 3, Division 2 of Title 27. <br /> The rationale for the sampling protocol used,the results of this sampling, and a <br /> rationale for classification of the solids shall be submitted-to Board staff for review. - <br /> 17: _-Leachate generation by a surface impoundment LCRS shall not exceed 85%of the <br /> design capacity of(a) the LCRS, or(b)the sump pump. -If leachate generation <br /> exceeds this value and/or if the depth of the fluid in an LCRS exceeds the minimum <br /> needed for safe pump operation, then the Discharger shall immediately cease the <br />