Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO , 4 <br /> THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY <br /> BNSF STOCKTON INTERMODAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> there are no significant differences in the characteristics of already approved liners and <br /> the liner proposed for the BNSF Intermodal Facility. <br /> Class II Surface Impoundments <br /> 24 . The Discharger proposes an engineered alternative to the prescriptive liner requirements <br /> of Title 27 for the Class II Surface Impoundment. The engineered alternative consists of <br /> from the top down: <br /> a. A primary 60-mil-thick High Density Polyethylene (HDPE) geomembrane <br /> b . A geonet drainage layer, as a Leachate Collection and Removal System (LCRS) <br /> c . A secondary 60-milAhick HDPE geomembrane in lieu of the clay liner <br /> d. A geonet drainage layer as a vadose zone monitoring system (VZMS) <br /> e . A tertiary 60-mil-thick HDPE geomembrane . <br /> 25 . The surface impoundment will have a geonet LCRS blanket across the entire area of the <br /> pond. The LCRS sump will be constructed of a gravel collection area and will have the <br /> capacity to store a minimum of 1 ,481 gallons , more than twice the maximum anticipated <br /> daily volume of leachate . Liquids removed from the LCRS will be returned to the <br /> surface impoundment . The sump includes with a high level alarm, if liquids trigger the <br /> level alarm the sump will be pumped out . <br /> 26 . The Discharger proposes a pan lysimeter (geonet blanket) under the entire area of the <br /> pond as an engineered alternative to the prescriptive unsaturated zone monitoring system <br /> requirements of Title 27 Section 20415 (d) . The surface impoundment vadose zone <br /> monitoring system (VZMS) will consists of a geonet blanket across the entire area of the <br /> pond . The VZMS sump will be constructed of a gravel collection area and will have the <br /> capacity to store 449 gallons . Any liquids that are detected in the VZMS sump will be <br /> removed and returned to the surface impoundment. The sump will include a high-level <br /> alarm, if liquids trigger the level alarm the sump will be pumped out. <br /> CEQA AND OTHER CONSIDERATIONS <br /> 27 . The San Joaquin County Community Development Department certified the final <br /> environmental impact report for the facility on 23 September 1999 . The Regional Board <br /> considered the environmental report in writing these WDRs . <br /> 28 . This Order implements : <br /> a. The Water Quality Control Plan for the Sacramento River and San Joaquin River <br /> Basin Fifth Edition ; <br /> b . The prescriptive standards and performance goals of California Code of <br /> Regulations, Title 27 , Division 2 . effective 18 July 1997 , and subsequent <br /> revisions . <br />