My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2900 - Site Mitigation Program
>
PR0544085
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 11:23:00 AM
Creation date
2/1/2019 10:36:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544085
PE
2965
FACILITY_ID
FA0012627
FACILITY_NAME
BNSF STOCKTON INTERMODAL FACILITY
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109023
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> WASTE DISCHARGE REQUIREMENTS ORDER NO , 7 <br /> THE BURLINGTON NORTHERN AND SANTA FE RAILWAY COMPANY <br /> BNSF STOCKTON INTERMODAL FACILITY <br /> SAN JOAQUIN COUNTY <br /> depth of the fluid in any LCRS sump shall be kept at the minimum needed for safe <br /> pump operation . <br /> 17 . Any direct-line discharge to a surface impoundment shall have fail - safe equipment <br /> or operating procedures to prevent overfilling. <br /> 18 . The surface impoundment shall be designed, constructed and maintained to prevent <br /> scouring and/or erosion of the liners and other containment features at points of <br /> discharge to the impoundments and by wave action at the water line . <br /> 19 . Leachate removed from a surface impoundment ' s primary LCRS shall be <br /> discharged to the impoundment from which it originated . <br /> 20 . Leachate generation by a surface impoundment to the primary LCRS shall not <br /> exceed design requirements . If leachate generation exceeds this value, then the <br /> Discharger shall immediately cease the discharge of waste, excluding leachate, to <br /> the impoundment and shall notify the Board in writing within seven days . <br /> Notification shall include a timetable for remedial action to repair the upper liner to <br /> the impoundment or other action necessary to reduce leachate production. <br /> 15 . If leachate is detected in the VZMS of a surface impoundment indicating a leak in <br /> both the primary and secondary liners the Discharger shall : <br /> a. Immediately cease discharge of waste, excluding leachate to the surface <br /> impoundment until the leaks can be found and repaired, <br /> b . report to the RWQCB that the primary and secondary liners have failed within <br /> 72 hours , <br /> c . submit written notification of the release to the RWQCB within seven days, <br /> the notification should include a time schedule to repair the primary and <br /> secondary liners , and <br /> d. discharge of wastes to the surface impoundment will not resume until the <br /> RWQCB has determined that repairs to the liners are complete and there is no <br /> further threat to water quality. <br /> 16 . Solids that accumulate in the surface impoundments shall be periodically removed <br /> to maintain minimum freeboard requirements and to maintain sufficient capacity for <br /> surface impoundment leachate and for the discharge of wastes . Prior to removal of <br /> these solids , sufficient samples shall be taken for their characterization and <br /> classification pursuant to Article 2 , Subchapter 2 , Chapter 3 , Division 2 of Title 27 . <br /> The rationale for the sampling protocol used, the results of this sampling, and a <br /> rationale for classification of the solids shall be submitted to Board staff for review. <br /> 17 . Leachate generation by a surface impoundment LCRS shall not exceed 85 % of the <br /> design capacity of (a) the LCRS , or (b) the sump pump . If leachate generation <br /> I <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.