Laserfiche WebLink
Rk <br /> M c C a m b b e I l A n a ly t i c a l Inc 1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> When Qualiq ('ornrn" htip://www,mccatnpbell.com/E-mail mainCa nccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: ENVIRONMENTAL LOGISTICS QC Level: LEVEL 2 Work Order: 1504168 <br /> Project: BNSF Stockton t#41731 Client Contact: Chris Whitt Date Received: 4/3/2015 <br /> Comments: Contact's Email: cwhitt@environmentallogistics.org <br /> WaterTrax []WriteOn EDF Excel Fax Email 1HardCopy 1 iThirdParty �J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle& Preservative De- Collection Date TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1504168-OOIA PROX-01 Solid SW8015B(Diesel) 1 <br /> II :1 F-1 4/3/2015 12:00 5 days Ll i <br /> SW8021 13/8015Bm(G/MBTEX) ❑ 5 days El <br /> SW 1010(Flash Point) ❑ 5 days <br /> SW6020(CAM 17) ❑ 5 days <br /> SW8260B(VOCs) El 5 days ❑ <br /> 150416 8-002A PROX-2 Solid SW802IB/8015Bm(G/MBTEX) ) <br /> I I A � 4/3/2015 12:00 5 days <br /> SW8260B(VOCs) 5 days ❑ <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> - MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1 of 1 <br /> n...-.. '" -C'1 <br />