My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2021 9:43:49 AM
Creation date
2/1/2019 1:52:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page 1 of 1 <br /> 4.TANK ANNULAR TESTING <br /> Test Method Developed By: r Tank Manufacturer C+ Industry Standard r Professional Engineer <br /> r Other(Specify) <br /> Test Method Used By: r Pressure G vacuum r Hydrostatic <br /> r Other(Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .20 <br /> Tank#T1:RUL Tank#T2:PUL Tank# Tank# <br /> Is Tank Exempt From Testing?t r Yes ro No r Yes ro NO r Yes r NO r Yes r NO <br /> Tank Capacity: 10026 10026 <br /> Tank Material: Steel Steel <br /> Tank Manufacturer: unknown unknown <br /> Product Stored: REGULAR P U L <br /> Wait time between applying pressure/vacuum/water and starting <br /> test: 15 min 15 min min min <br /> Test Start Time: 11:40:00 11:40:00 <br /> Initial Reading(RI): 15.00000 in. HG 15.00000 in. HG <br /> Test End Time: 11:40:00 11:40:00 <br /> Final Reading(RF) 15.00000 in. HG 15.00000 in. HG <br /> Test Duration: 24 hr 24 hr <br /> Change in Reading(RF-RI): 0.00000 in. HG 0.00000 in. HG <br /> Pass/Fail Threshold or Criteria: +/-0.00000 +/-0.00000 +/- +/- <br /> Test Result: Pass Pass <br /> Was sensor removed for testing? f* Yes r No r NA a Yes r NO r NA r Yes r Nor NA r Yes f NO r NA <br /> Was sensor properly replaced and verified functional after <br /> testing? f: Yes r No r NA r Yes r No r NA r Yes r No NA r Yes r No � NA <br /> Comments(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Tests started 11:40 AM on 10/10/18 and was completed at 11:40 AM on 10/11/18 <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems <br /> that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.