Laserfiche WebLink
W.O.# NW1-2338786 <br /> TanknoInc. <br /> I I UVO N.MaPae L•xpressway,,Suite s00 qq Au Austin,TX 78758 (800)964•0010 Policy I00-29-A <br /> JOB CLEARANCE FORM& Rev:F <br /> SITE SAFETY CHECKLIST—OW Revised:3/05/2018 <br /> Site Nemeth/.: <br /> '-1r. i 20 ca Street Address: W.O.p <br /> 3Z <br /> Anival Ti, Departuw'rlme: �� -1,1 C, Z 336 <br /> V. <br /> travel'rime: Others on site: Oate 11 <br /> scope of Wantl Tasks AertarmedJSA's <br /> t usl be available Or all tasks): <br /> Repairs to Equlpmem or Pa�Provided:t (�L <br /> Follow-up actions required;equipment isolated;commeNs: <br /> PPE-PERSONAL PROTE TIVE EQUIPMENT REQUlRED(Check- items used or mark—if not applicable) <br /> fety Vest Safety Glasses <br /> Gloves LI Hearing Protection <br /> I Steel Toe Boots ❑ SPlash Goggles ❑ Hard Hat ❑ Other <br /> ,./ ✓ PRE-TEST PROCEDURES Check ,'each if,m campleled or mark — ifnot a licable <br /> 1 .X� Discuss safety procedures with site personnel. Nearest hospital: <br /> 2, i_I Prior to fuel deliveries the UST system must be placed back into working order. <br /> 3. ❑ .Secure entire work area with barricades(cones,flags,and extension bars,caution tape,pennant flags,or other perimeter guard). <br /> 4. Place fire extinguishers and"No Smoking"signs in the work area. <br /> 5_ ❑ implement Lockout/Tagout per API 1646(when accessing product piping during tasks) <br /> ❑ Secure nozzles with"Out of Service"bags and nylon lies. ❑ Secure the circuit breaker(s)with lockout devices and tags. <br /> Close ball valves or check valves on product piping. ❑ Disconnect electrical"bayonet"connector from the STP(s). <br /> ❑ All applicable equipment disabled during test(s). ❑ Verify LOTO is complete by trying to operate pumps. <br /> SIGN IN Lead Technician Name LeatlTechnician Sigrialure <br /> General Safety Checks: <br /> All site personnel have been informed. <br /> Fuel delivery has been informed. Slle�epresentalive Name <br /> Is a fuel delivery due today? presentetive signature <br /> LOTO procedures have been discussed and agreed. ((A t t <br /> Work areas barricaded to protect workers,staff&public. I have discussed job clears a form with technician. <br /> ✓ POST-TEST PROCEDURES Check each item com feted or mark if ndt applicablej <br /> 1. ❑ Remove all"LockoutlTagout"devices. <br /> 2. ❑ Run all pumps and verify there are no leaks: ❑ Impact Valve Test Ports under dispensers <br /> ❑ Leak Detector Threads on STP's ❑ Functional Elements&Relief Screws <br /> 3. ❑ Install lead wire seal on all test plugs&leak detectors that were serviced. <br /> Count LD threads: L1_ L2 L3 L4— L5_ L6_ <br /> 4. ❑ Check following components operational: ❑ ATG probes,sensors,&caps <br /> ❑ Ball floats,dry breaks&caps ❑ Cathodic protection operational <br /> ❑ Containment sumps are dry n Dispensers&POS operational <br /> ❑ Dispenser panels are replaced ❑ Drop tubes,fill adapters&caps <br /> ❑ Leak detectors&vent tubes L, Manhole covers and sump lids <br /> ❑ Monitoring system is operational ❑ Shear valves are open <br /> ❑ Siphon lines and manifold valves ❑ Spill containers&drain valves <br /> ❑ STP fittings and bayonet connectors Cl Vents(not capped,plugged or isolated) <br /> F <br /> ❑ Remove barricades. tead Technlclan Name lead Technlydan Signature <br /> SIGN OUT&O erator Verification of Work(OVF) <br /> Safety Checks:ea has been left tidy&Safe. Repr enlptive NamaRepresentative Signature <br /> f are aware of work status including any remaining Isolation. <br /> to equipment are documented and communicated. Iii <br /> nts,near incidents,and unsafe situations reported.sentative Comments: <br /> ©Tartknology Inc.,2018,All Rights Reserved. <br /> COMPANY CONFIDENTIAL <br /> ontrolled. TJte cu rent version is available in the Tanknolo On-Line Document Control S stem. <br /> Printed copies of this docunlenl are one <br />