Laserfiche WebLink
' Rajappan&Meyer • Date: 1/7/99 <br /> Arch Road/Highway 99 Page: 7 <br /> ' 3.0 DELIVERABLES <br /> Upon completion of sampling activities, a letter report will be submitted detailing the <br /> results of this sampling activity. The report will include the following: <br /> • Photodocumentation of the sampling events; <br /> • Revised sampling location maps; <br /> • Laboratory analytical data reports; <br /> • Chain-of-custody documentation; <br /> • Narrative of sample collection activities; <br /> • Deviations from the Work Plan; <br /> ' • Comparisons of sample results to applicable regulatory standards; <br /> • Delineation of areas in exceedance of applicable regulatory standards; and <br /> • Recommendations for additional work, as required. <br /> 4.0 SCHEDULE <br /> ' The following table outlines the current schedule (pending approval of this Work Plan by <br /> the County). <br /> Activity Date <br /> Conduct Geophysical Survey Week of January 11, 1999 <br /> ' Collect Surface Soil Samples Week of January 11, 1999 <br /> Collect Subsurface Samples Week of January 18, 1999 <br /> Submit Report Week of February 8, 1999 <br /> ' R&M/Arch Rd/43-00066762.00.1000 <br />