Laserfiche WebLink
Anheuser-Busch/Arch Road <br /> Site Safety Plan <br /> February 11, 1992 <br /> Drinking alcoholic beverages is prohibited. Drinking alcoholic <br /> beverages and driving is prohibited at any time. Driving at excessive <br /> speeds is always prohibited. <br /> Skin abrasions must be thoroughly protected to prevent chemicals from <br /> penetrating the abrasion. It is recommended that Contact Lenses not be <br /> worn by persons working on the site. <br /> 9.10 MSDS Information <br /> Material Safety Data Sheets (MSDS) on chemical substances encountered <br /> at the site shall be made available to all persons (including <br /> subcontractors) working at the site. These MSDSs shall be enclosed <br /> within this site safety plan in Appendix I. For emergency situations <br /> not specifically addressed by this site safety plan, refer to MSDS <br /> recommendations for action information. <br /> 10.0 PROJECT PERSONNEL <br /> Groundwater Technology, Inc. will oversee and act accordingly during <br /> all phases of the project. The following management structure will be <br /> instituted for the purpose of successfully and safely completing this <br /> project. <br /> 10.1 Proiect Manager: <br /> Mike Wray <br /> The Project Manager will be responsible for implementing the project <br /> and obtaining any necessary personnel or resources for the completion <br /> of the project. Specific duties will include: <br /> ♦ coordinating the activities of all subcontractors, to include <br /> informing them of the required personal protective equipment <br /> and ensuring their signature acknowledging this Site Safety <br /> Plan (see Appendix A) , <br /> ♦ selecting a Site Safety Officer and field personnel for the <br /> work to be undertaken on site, <br /> ♦ ensuring that the tasks assigned are being completed as planned <br /> and on schedule, <br /> ♦ providing authority and resources to ensure that the Site <br /> Safety Officer is able to implement and manage safety <br /> procedures, <br /> ♦ preparing reports and recommendations about the project to <br /> clients and affected Groundwater Technology, Inc. personnel, <br /> 22 <br />