My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BACON ISLAND
>
20590
>
2900 - Site Mitigation Program
>
PR0530693
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:19:37 PM
Creation date
2/5/2019 3:10:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0530693
PE
2950
FACILITY_ID
FA0019898
FACILITY_NAME
BACON ISLAND
STREET_NUMBER
20590
Direction
W
STREET_NAME
BACON ISLAND
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12905052
CURRENT_STATUS
01
SITE_LOCATION
20590 W BACON ISLAND RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br /> SITE HEALTH AND SAFETY PLAN <br /> Hultgren—Tillis Engineers (H—TE) <br /> I. GENERAL SITE INFORMATION <br /> Site Name: Bacon Island approx Station 200+00 <br /> Site Address: <br /> Contact Person: Rick Chen Phone: 0:925-685-6300/cell:925-348-3627 <br /> Site Identification Number: 689.02 Proposed Date(s) of Site Work: 09/14-10/20/09 <br /> IL DESCRIPTION OF ACTIVITY <br /> Purpose of Activity: Type of Site <br /> X Geotechnical Soil Boring ❑ Industrial <br /> ❑ Gas extraction well installation ❑ Gas station <br /> ❑ Agricultural well installation X Other(specify): Levee/Slough-River <br /> X Other(specify): Installation of Piezometer <br /> Provide a brief description of the proposed activities: <br /> 1. H-TE engineer will mark USA white paint for the soil boring and call USA. <br /> 2. H-TE engineer and subcontract driller will drill borings 50-60 feet deep and collect soil <br /> samples at the locations shown on the site plan. After borings are completed,H-TE engineer <br /> and subcontract driller will convert 1 soil boring into a monitoring well (piezometer). <br /> Investigation-derived material disposal: <br /> Soil: soil cuttings may either be removed or spread out near the exploration holes. <br /> Water and Fluids: NA <br /> Other: NA <br /> III. POTENTIAL HEALTH AND SAFETY HAZARDS <br /> Potential Hazards include: <br /> Heavy equipment-physical injury/trauma resulting from moving machinery <br /> Electrical hazards -nearby overhead wires underground utilities <br /> Slippery and/or Bumpy Roads <br /> Falls, trips, slips <br /> Mosquitoes <br /> Dust <br /> Noise <br />
The URL can be used to link to this page
Your browser does not support the video tag.