My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2900 - Site Mitigation Program
>
PR0526345
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 3:57:12 PM
Creation date
2/5/2019 3:45:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526345
PE
2957
FACILITY_ID
FA0017827
FACILITY_NAME
FLAG CITY SHELL
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lodi irp • Page 1 of 3 <br /> Mike Infurna [EH] <br /> From: Mike Sgourakis [msgourakis@apexenvirotech.com] <br /> Sent: Tuesday, April 11, 2006 1:49 PM <br /> To: Mike Infuma [EH] <br /> Subject: RE: Lodi irp <br /> Yes, we are sampling water directly from the well pre and post pump. We will continue to do so. Next Tuesdays <br /> extraction will be done this week over a one day period. 10 gpm or 600 gp hour for nine hours verses six for the <br /> vacuum truck. We will sample pre and post. Then the vac driver will off haul next Tuesday. This way we avoid <br /> paying for the driver while on site since the aquifer is the limiting factor while continuing the 5,000 gallons per <br /> week of mass removal. <br /> Thanks <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, April 11, 2006 1:49 PM <br /> To: Mike Sgourakis <br /> Subject: RE: Lodi irp <br /> I'm a little confused here. <br /> Next Tuesday's extraction will be done on what day? your pumps extract <br /> over 'how long of a period'? Stored how long? Sampled when and how long <br /> After it's been extracted? <br /> are you sampling the well before you pump? and again after 5K out? <br /> -----Original Message----- <br /> From: Mike Sgourakis [mailto:msgourakis@apexenvirotech.com] <br /> Sent: Tuesday, April 11, 2006 1:29 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Lodi irp <br /> will do Mike. Thanks <br /> Every Tuesday morning a vacuum truck will haul 5,000 gallons of water off site. The first two events <br /> were conducted using stingers and pulling water directly from the well(s). The future extractions will <br /> be conducted differently. We will use our pumps and store 5,000 gallons on site in a poly tank and it <br /> will be vacuumed out every Tuesday. This procedure will save time and money. It has taken 6 plus <br /> hours to vac from wells and at 110.00 per hour for a vac driver, its expensive. It will only take him <br /> 30 minutes to vac from the tank. <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Tuesday, April 11, 2006 1:29 PM <br /> To: Mike Sgourakis <br /> Subject: Lodi irp <br /> Mike, <br /> 4/19/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.