Laserfiche WebLink
Margaret Lagorio [EH] <br /> From: Margaret Lagorio [EH] <br /> Sent: Wednesday, December 06, 2006 11:52 AM <br /> To: James L. L. Barton (E-mail) <br /> Subject: 6437 Banner, Lodi <br /> Jim, <br /> Sorry it took longer to get this information to you than I thought but here are some points and information on the Shell and <br /> Chevron sites. <br /> 1. A drinking water well was installed at 14749 Thornton Road for 3 B's truck facility in July 1981 when Richard Bokides <br /> owned the property. This well still exists but its use is minimal. <br /> 2. A drinking water well for 14659 Thornton Road, Rocky's Restaurant,was installed in March 1984. The first time this <br /> well water was tested for MTBE was 2/25/99 and it had 7 ppb MTBE. This well was destroyed in March 2002 after the <br /> County Service area 31 (CSA31) allowed the restaurant to connect to their water system. It is very effident that this well <br /> affected the flow of groundwater at the Chevron site. <br /> 3. The first UST's were installed at the Chevron site in 1983. The water for the site was from a well north of the Chevron <br /> site (see drawing attached). In May 1991 three monitoring wells were installed at the Chevron site for an environmental <br /> assessment. The May 9, 1991 contour map showed water flowing north-northeast towards the drinking water well. A May <br /> 18, 1993 potentiometric map shows water flowing northwest(between the Chevron well and Rocky's well)and a water <br /> sample from MW 1 had benzene so the site was placed in the LOP on May 21, 1993. <br /> 4. CSA 31 wells were drilled southeast of Chevron in September 1994. The Chevron site was connected to the CSA31 <br /> water system and the well north of Chevron was destroyed on 4/20/95. The July 19, 1996 Groundwater elevation map <br /> (attached)shows water flow southeast. The August 23, 1996 map (attached)shows water flow southwest towards <br /> Rocky's well. A Geoprobe investigation in August and September 1997showed the contaminant plume to have migrated to <br /> the southwest towards Rocky's well (map attached). <br /> 5. After Rocky's well was confirmed to be contaminated with MTBE Regional Board took the lead regulatory status on <br /> 2/16/00. <br /> 6. In 1999 groundwater flow maps show varing flow directions and once groundwater extraction started in November 2000 <br /> the groundwater flow at the Chevron was towards the extraction wells. The statement that groundwater flowed north for 10 <br /> years has no support. <br /> 6. Corrections to Draft C &A. - BACKGROUND#5 last sentence should read: On 9 March 2005, the Site was placed in <br /> the SJCEHD Local Oversight Program. BACKGROUND#6 first sentence should read: According to SJCEHD files, in a <br /> phone conversation with the Dischargers prior to 9 March 2005, SJCEHD requested a work plan to delineate the vertical <br /> and lateral extent of the MTBE groundwater plume within 60 days. <br /> }; <br /> It <br /> Scanned_.pdf Scanned_.pdf Scanned_.pdf <br /> Hope this helps. <br /> Margaret <br /> 1 <br />