Laserfiche WebLink
MW report+ • Page 2 of 2 <br /> The report of findings (Monitoring/Extraction Well Installation Report)for MW5A, 513, 66, 6C and the <br /> last extractions wells (EW-4 and -5) installed in Nov 2005 is overdue. <br /> The quarterly monitoring report, 4th 2005 (not just the data as previously submitted, the whole report <br /> with gradient info, isocons, etc per Tri Regional Format) is also overdue. <br /> please submit these to EHD before Feb 15 and upload the data/report to Geotracker immediately. <br /> Additionally, you are required to notify EHD of all field work at this site and I haven't heard from you <br /> about the pump test work to be done by Feb 15. <br /> - - --•-+� ITI111 <br /> 2/10/2006 <br />