Laserfiche WebLink
Chevron <br /> ig Chevron <br /> Grp Chevron Environmental Management <br /> June 28, 1999 Company <br /> 6001 Bollinger Canyon Road, <br /> P.0.Box 6012 <br /> San Ramon,CA 94583-0712 <br /> Ms. Karen Bessette <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827 <br /> Proposed Soil Boring Work Plan <br /> Defense Distribution Depot <br /> Tracy, California <br /> Dear Ms. Bessette: <br /> Please find enclosed the subject work plan prepared by Geomatrix Consultants, Inc., on <br /> behalf of Chevron Environmental Management Company. Field work will be scheduled <br /> upon receipt of your approval of the work plan. <br /> If you have any questions or require additional information, please call Elizabeth Lu at <br /> (925)842-1343 or me at(925)842-1341. <br /> Sincerely, <br /> K. L. Hower <br /> Project Manager <br /> cc: Wendy Cohen—RWQCB <br /> Lindy Austin—Rust Environment and Infrastructure <br /> Elizabeth Lu—Geomatrix Consultants, Inc. <br /> wak ta.ln (Holl- SaK 7oa�N lvr C PLcCs2+'G flea C . 7e�_ <br />