My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:52 PM
Creation date
2/5/2019 4:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a r ► <br /> • I -0 <br /> � <br /> SECOR www.secor.com <br /> y,. <br /> INTERNATIONAL 57 Lafayette Circle,2ntl Floor <br /> S E C O R INCORPORATED Lafayette,CA 94549 <br /> SAN JOAQUIN COUNTY 925-299-9300 TEL <br /> ENVIRONMENTAL HEALTH DEPARTMENT25-299-9302 FAX <br /> 304 E WEBER AVE THIRD FLOOR <br /> STOCKTON CA 95202 <br /> February 11, 2004 <br /> (209)q88-3420 <br /> Approved <br /> Approved with changes: See Remarks © _ <br /> +] Disapproved: See Remarks 200 0 � - <br /> Rema <br /> X �H�� � � <br /> Mr. Harlin Knoll S — _ <br /> San Joaquin County Environmental He <br /> 304 E Weber Avenue, 3`d Floor <br /> 7- <br /> Stockton, <br /> Stockton, CA 95202-2708 Date.��l sl r r <br /> Approval extends only to that which is shown and described <br /> RE: Drilling Permit SR0030384 ereon and does not authorize or approve any omission ces <br /> 2644 South Banta Road,Tracy,M-04rom requirements of state laws or local ordinances. <br /> SECOR Project No.: 050T.50086.00.0002 <br /> Dear Harlin: <br /> As previously discussed in our phone conversation on Monday, February 9, 2004, Pioneer Americas <br /> LLC (Pioneer) is planning on installing 3 additional wells (MW-13, MW-14, and MW-15) north of their <br /> facility located at 26700 South Banta Road in Tracy, California. SECOR International Inc. is <br /> Pioneer's environmental consultant in charge of the well installation under the direction of the <br /> California Regional Water Quality Control Board – Central Valley Region (RWQCB). Based on our <br /> phone conversation Pioneer will be able to utilize existing San Joaquin County Environmental Health <br /> Department (SJC-EHD) Permit SR0030384 for the planned well installation. <br /> As with the previous wells at the site, the address for the well locations is 2644 South Banta Road <br /> (APN 252-15-10), Tracy California, and we plan on using Gregg Drilling (License C57-485165) to <br /> install the wells. As requested, in order to update SJC-EHD Permit SR0030384, the following <br /> documents are enclosed: <br /> 1) Memo updating billing information for Pioneer dated February 9, 2004; <br /> i <br /> 2) Updated letter of permission (signed Request for Access letter) to drill from property owner <br /> A&M Pombo Partnership, dated December 30, 2003; <br /> 3) Offsite Groundwater Investigation Work Plan, dated June 7, 2001; <br /> 4) Letter proposing revised offsite well location, Proposed Offsite Well Location, dated <br /> December 5, 2002; <br /> 5) RWQCB letter dated June 12, 2001 approving June 7, 2001 Offsite Groundwater <br /> Investigation Work Plan; <br /> 6) RWQCB letter dated December 12, 2002 approving revised offsite well location submitted in <br /> December 5, 2002 Proposed Offsite Well Location letter. <br /> SECOR is currently scheduled to install the wells beginning on March 2, 2004. The well installation <br /> is expected to take four days to complete. If you have any questions or require any additional <br /> information, please contact Lisa Tuck of Pioneer at (713) 570-3202 or Eva Hey of SECOR at (925) <br /> 299-9300 x 223. <br /> Harlin Knoll 2.11.04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.