My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:52 PM
Creation date
2/5/2019 4:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TIMELINE-OFFSITE VOC INVESTIGATION c <br /> All Pure Chemical Company-Tracy Facility <br /> August Se tember October I November December I January <br /> ID Task Name Duration Start 8/1 1 8/22 1 9/12 10/3 1 10/24 11/14 12/5 1 12/26 1 1/16 <br /> 1 Offsite VOC Groundwater Investigation 161 days 8/30/99 <br /> 2 Field Work 30 days 8/30/99 <br /> 3 Obtain necessary permits 5 days 9/6/99 <br /> 4 Procure laboratory services 7 days 9/6/99 <br /> 5 Procure Hydropunch services 7 days 8/30/99 ttt# <br /> 6 Survey sample locations 2 days 9/21/99 <br /> 7 Field operations-groundwater sampling 10 days 9/27/99 tater • <br /> 8 Submit samples for laboratory analysis 10 days 9/27/99 <br /> 9 Site Investigation Report Preparation 66 days 10118/99 <br /> 10 Review laboratory results 10 days 10118/99 <br /> 11 Prepare report text-draft 30 days 11/1/99 <br /> 12 Prepare report figures-draft 30 days 11/1/99 <br /> 13 Prepare report tables-draft 30 days 11/1/99 <br /> 14 QA/AC draft report 5 days 12/13/99 <br /> 15 Submit draft to All Pure for review 1 day 12/20/99 <br /> 16 All Pure Review 10 days 12/21/99 <br /> 17 Prepare Final Site Investigation Report 10 days 1/4/00 <br /> 18 Submit Final Report to RWQCB 0 days 1/17/00 ♦ • <br /> Task Rolled Up Task Project Summary <br /> IT Corporation Project No. 777287 Progress Rolled Up Milestone Split , , , , , , , , <br /> Date:6/22/99 <br /> Page 1 of 1 Milestone Rolled Up Progress Rolled Up Split , , , , , <br /> Summary External Tasks <br />
The URL can be used to link to this page
Your browser does not support the video tag.