My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANTA
>
26700
>
2900 - Site Mitigation Program
>
PR0506297
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2019 5:14:52 PM
Creation date
2/5/2019 4:58:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506297
PE
2960
FACILITY_ID
FA0018711
FACILITY_NAME
OLIN CHLOR ALKALI PRODUCTS
STREET_NUMBER
26700
Direction
S
STREET_NAME
BANTA
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25215008
CURRENT_STATUS
01
SITE_LOCATION
26700 S BANTA RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F <br /> • <br /> CLEANUP AND ABATEMENT ORDER _5_ <br /> PIONEER AMERICAS,INC. <br /> PIONEER CHLOR ALKALI COMPANY,INC. <br /> ALL PURE CHEMICAL COMPANY <br /> SAN JOAQUIN COUNTY <br /> lateral and vertical extent of groundwater contamination. If no. rfihex�'�ss`Ossment work <br /> is required, the report shall include a remedial action plan and l npleme Cation time <br /> schedule. <br /> d. Within 60 days of Board approval, but in no event later than 3 ..5P.xember 199'7; <br /> P.complete the additional assessment work prop ot :`ri'the site assessgt report and...:' <br /> submit a final site assessment report. <br /> XX <br /> e. Within 60 days of approval of the final siteassesnerYtepor 'but in no event later than <br /> 30 March 1998, submit for approval a detailed remedial action plan with a time schedule <br /> for approval by the Executive Officer. Upon'approval of the Ti :edtad action plan, <br /> implement the approved remedial actions in accoNap %with the apprbved time schedule <br /> which will become part of this Order. <br /> f. By the 30th of the month following..: e` d.of each calendar:::tl a.rter, submit quarterly <br /> reports which provide informatir i-o' n the inZigations, remediation systems operation, <br /> remediation activities, and resi'.ts. <groundwatei•:: pling. <br /> g. Obtain all local and state per lits ecess. <to fulfill;<the requirement of this Order prior <br /> to beginning work. <br /> 2. Reports and work plans a--.-o4��fbllow SWKCB Reso,1€tion 92-49 which is made a part of this <br /> Order. <br /> 3. The investigative an-1 cleanW.p<: sks required in Items a through f above shall be conducted under <br /> the direction of a, aliform"--egistered Civil Engineer or Registered Geologist experienced in <br /> the area of groundwater clean ;;Ml:::.�eports andplans shall be prepared and signed by a <br /> Wistered Geologist t .Registered E&ineer. <br /> A. <br /> 4. ;:''All re"d"us must include ac' ver.,letter from the responsible parties stating: <br /> Agr6&nent or disagreement with the conclusions and recommendations in the <br /> report. <br /> b. <:. The.report is consistent with and follows the Board's guidelines. <br /> 5. ReimMIZK;t e R*tonal Water Quality Control Board for reasonable costs associated with <br /> `<::;.oversight of th'. investigation and cleanup. <br /> WILLIAM H. CROOKS, Executive Officer <br /> Dated: 5 November 1996 <br /> PAL:pal/lsb <br />
The URL can be used to link to this page
Your browser does not support the video tag.