My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
200
>
3500 - Local Oversight Program
>
PR0544106
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 10:54:26 AM
Creation date
2/6/2019 9:48:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544106
PE
3528
FACILITY_ID
FA0015207
FACILITY_NAME
SJC MOSQUITO & VECTOR CONTROL DIST
STREET_NUMBER
200
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04905031
CURRENT_STATUS
02
SITE_LOCATION
200 N BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> iAodj <br /> CHRONOLOGY <br /> { <br /> 200 N BECKMAN RD <br /> LODI <br /> SITE CODE: 1849 <br /> 1 000 gallon unleaded and 8 000 gallon larvicide <br /> os/13/s6 g ' , g � <br /> tank removed. Six soil b"rings drilled. <br /> 1 <br /> 12/10/86 1-8,000 gallon UST removed - (larvicide) - <br /> Excavation occurred to a depth of 31 feet below <br /> ground - TBH and BTEX were present 31 feet below <br /> the gasoline tank - Sampling below the weed oil ` <br /> and larvicide tank revealed no detectible <br /> hydrocarbons - <br /> 12/86 3 groundwater monitoring wells installed - No <br /> groundwater contamination present - <br /> )A '} � <br /> 1991 Quarterly groundwater monitoring program began - <br /> 06/14/92 MW-4 installed downgradilnt -� MO-2 and MO-3 were <br /> dry - <br /> 08/25/92 MW-1 and MW-4-ND- P <br /> MW-2 and MW-3 dry- <br /> fl y <br /> Screen- MW-4-50' thru 70' <br /> MW-3-30' thru 55' <br /> MW-2-30' thru 55' <br /> MW-1-30' thru 55' <br /> 02/17/94 Received and approved workplan for 4 soil borings <br /> and 2 hydropunches thru 21 existing dry monitoring <br /> wells. <br /> k <br /> r � <br /> 6 <br /> A � <br /> F <br /> � s <br />
The URL can be used to link to this page
Your browser does not support the video tag.