My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
500
>
2900 - Site Mitigation Program
>
PR0523834
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 1:16:57 PM
Creation date
2/6/2019 1:10:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523834
PE
2950
FACILITY_ID
FA0016052
FACILITY_NAME
RE SERVICE CO
STREET_NUMBER
500
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04925081
CURRENT_STATUS
02
SITE_LOCATION
500 S BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Claytoi'f <br /> KEY PERSONNEL ROLES AND RESPONSIBILITIES <br /> ' Proiect Supervisor <br /> ' The Project Supervisor, Mr. Jon Rosso, has the responsibility for all field work and <br /> enforces safe work practices by all workers. He directs all project investigation, <br /> monitoring, and remedial activities at the site. <br /> Site Safety Officer(SSO) <br /> ' The Site Safety Officer(SSO), Mr. Craig Pelletier(or other person designated by <br /> Clayton), has the responsibility for implementing and enforcing the site safety program <br /> and procedures. He maintains the appropriate protection equipment and enforces the use <br /> ' of protection equipment. He oversees the on-site air monitoring and decides when action <br /> levels have been reached and when more stringent personnel protection is required. Mr. <br /> Werfal has the primary responsibility for the approval of all site operations that will be <br /> ' conducted during the field investigation. <br /> Mr. Pelletier will take the following actions when appropriate: <br /> ' ➢ Order the immediate evacuation of personnel from the work area during serious or <br /> life-threatening situations <br /> ' ➢ Take charge during emergency situations,notifying local public emergency officials <br /> when necessary <br /> ' ➢ Require personnel engaged in field work at the site to obtain immediate medical <br /> attention in the case of a work-related injury or illness <br /> ' ➢ Properly store and maintain protective clothing and equipment (Clayton site <br /> personnel only) <br /> ' ➢ Restrict visitors from areas of potential exposure to harmful substances <br /> 1 <br /> ' PLUSTS\PROJRCfS2W5W5628 RR Service CompanY\H&SP.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.