My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
880
>
2900 - Site Mitigation Program
>
PR0543466
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 1:50:26 PM
Creation date
2/6/2019 1:21:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543466
PE
3528
FACILITY_ID
FA0004942
FACILITY_NAME
MATAGA OLDS BUICK INC
STREET_NUMBER
880
Direction
S
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95241
APN
04925026
CURRENT_STATUS
02
SITE_LOCATION
880 S BECKMAN RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> OIL EQUIPMENT SERVICE STATE LICENSE32 <br /> CLRSSiF1CRTION: A-RAZ., CCOWWD40 <br /> Division of Keith A. Tallia, Inc. STATE ENVIRONMENTAL ASSESSOR No.: 01781 <br /> Telephone: (209) 754-1808 <br /> Post Office Box 950 <br /> 750 Industrial Way <br /> SAN ANDREAS, CALIFORNIA 95249 <br /> "EXECUTIVE SUMMARY" <br /> Proposed Remediation Work <br /> Mataga Olds - Buick <br /> 880 So . Beckman Road <br /> Lodi , CA 95240 <br /> On May 31 , 1991 a 550 gallon , single wall steel , underground <br /> waste oil storage tank was removed at this site . Soil samples <br /> were captured from the excavation at that time . Laboratory analysis <br /> of these samples revealed that Motor Oil , Xylene , Benzene and <br /> various metals were present in the soils in this excavation above <br /> normal threshold limits . No Diesel , PCB ' s or Chlorinated Hydro- <br /> carbons were detected in the soil samples . <br /> It is now proposed to remove the contaminated soils from the <br /> excavation as follows : <br /> A large Hopto 550 backhoe will be used to excavate an additional <br /> 3 to 5 feet of soils from the North , East and West ends of the <br /> initial excavation . It is estimated that approximately 15 cubic <br /> yards of soil will be removed during this over excavation . Visual <br /> inspection and field detection equipment (Organic Vapor Analyzer- <br /> FID) will be used to screen the soils during excavation to assist <br /> in evaluating the limits of contamination . <br /> The excavated soil will be placed on and covered with B mil . <br /> plastic sheeting for temporary storage on site to await proper <br /> disposal . <br /> At the conclusion of excavation , confirming soil samples will <br /> be captured from the excavation and analyzed in a laboratory to <br /> confirm if all the contaminants have been removed from the exca- <br /> vation . <br /> Once it is confirmed that all contaminates have been removed <br /> to below threshold levels , the excavation will be back filled <br /> with pea gravel and the surface paving replaced . <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.