Laserfiche WebLink
r <br /> Groundwater Monitoring <br /> ARCADIS Report for the Semiannual <br /> Period from January 1 <br /> through June 30,2012 <br /> Lincoln Center, Stockton, <br /> California <br /> between 1995 and 2005 was presented in LFR's"Groundwater Monitoring Report for <br /> the Biannual Period from July 1, 2005 through December 31,2005,"dated February 15, <br /> 2006 (LFR 2006). <br /> During the June 2012 sampling event, chloroform was detected In two monitoring wells, <br /> MW-001A and MW-110A, at concentrations of 19 and 1.6 pg/I,respectively. In addition, <br /> 1,2-dichloroethane was detected at an estimated concentration of 3.6 pg/I In one <br /> monitoring well,MW-101 <br /> 2.3.3 Phase V IRA Monitoring ResUItS <br /> As discussed in Section 1.3, Phase V IRA monitoring is included as part of routine <br /> monitoring at the Site.The Phase V IRA monitoring well network consists of two <br /> monitoring wells located upgradient from the ERD injection area,six monitoring wells <br /> located within the ERD injection area, and seven monitoring wells and three <br /> piezometers located downgradient from the ERD injection area. During the reporting <br /> period,groundwater samples were collected from eight monitoring wells to monitor <br /> ongoing performance of the Phase V IRA: <br /> • Monitoring well MW 020B, located upgradient from the ERD injection area; <br /> • Monitoring wells MW-122A-U, MW-124A-L, MW-2148, and MW-301C,located <br /> within the ERD injection area, and <br /> • Monitoring wells MW-121A-U, MW-123A-L,and MW-2158,located downgradient <br /> from the ERD injection area. <br /> The remaining Phase V IRA monitoring wells were sampled during the December 2011 <br /> event in accordance with the RWQCB-approved sampling schedule(see Section 1.3). <br /> The Phase V IRA consisted of(1) implementing an ERD program in the A-zone,and <br /> (2)assessing the need for ERD technology in the B-zone.A figure illustrating the <br /> locations of the Phase V IRA components is presented in Appendix B. During <br /> construction of the Phase V IRA system,two well clusters were installed downgradient <br /> from the injection array,in accordance with LFR's"Phase V Interim Remedial Action <br /> Detailed Plan,"dated September 27, 2007(LFR 2007). Each cluster Includes three <br /> wells,one screened in the upper A-zone(MW-121A-U and MW-122A-U),one screened <br /> in the lowerA-zone(MW-123A-L and MW-124A-L),and one screened in the B-zone <br /> (MW-2148 and MW-215B).The first and second well clusters,respectively,are located <br /> �"_w cw worzeiwmrsoa"" 9 <br />