My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 4:32:50 PM
Creation date
2/6/2019 4:14:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1 <br /> SOIL BORINGS AND WELL COMPLETIONS <br /> ARCO Service Station#2133&Chevron Service Station#9-4275 <br /> 2908 and 2905 Benjamin Hilt Drive <br /> Stockton,California <br /> Well Screen Screen <br /> Well Installation Depth Diameter Top Bottom Length Comments <br /> I.D. Date (feet bgs) (inches) (feet bgs) (feet bgs) (feet) <br /> Monitoring Wells <br /> MW-1 -- 31.5 4 5 31.5 26.5 Destroyed May 2005 <br /> MW-2 -- 31.5 4 5 31.5 26.5 Destroyed May 2005 <br /> MW-3 -- 28.5 4 5 28.5 23.5 Destroyed May 2005 <br /> MW-4 -- 30 4 5 30 25 Destroyed May 2005 <br /> MW-5 -- 25 4 5 25 25 Destroyed May 2005 <br /> MW-6 03/03/92 31.5 2 10 30 20 Destroyed May 2005 <br /> MW-7 03/03/92 31.5 2 10 30 20 Destroyed May 2005 <br /> MW-8 -- 29 2 5 29 24 Destroyed May 2005 <br /> MW-9 06/20/94 31.5 2 10 30 20 Destroyed May 2005 <br /> Remediation Wells <br /> GM-1 -- 35 9 5 35 30 Destroyed May 2005 <br /> GM-2 -- 35 9 5 35 30 Destroyed May 2005 <br /> GM-3 -- 30 9 15 30 15 Destroyed May 2005 <br /> GM-4 -- 30 9 15 30 15 Destroyed May 2005 <br /> GM-5 -- 30 9 15 30 15 Destroyed May 2005 <br /> GM-6 -- 30 9 15 30 1 15 Destroyed May 2005 <br /> GM-7 -- 30 9 15 30 15 Destroyed May 2005 <br /> GM-8 -- 30 9 15 30 15 Destroyed May 2005 <br /> GM-9 -- 30 9 15 30 15 Destroyed May 2005 <br /> VW-1 1 03/03/92 20 2 12.5 17.5 5 Destroyed May 2005 <br /> R-1 I Oct-88 48? 6 8 48 40 Destroyed <br /> Proposed Well and Borings <br /> AS-8 — 60 -- -- — -- Proposed Soil Boring <br /> AS-9 -- 60 -- -- -- -- Proposed Soil Boring <br /> AS-10 -- 60 -- -- -- -- Proposed Soil Boring <br /> AS-11 -- 30 -- -- -- -- Proposed Soil Boring <br /> MW-JR -- 60 2 5 20 15 Proposed Replacement Well <br /> MW-2R -- 60 2 S 20 15 Proposed Replacement Well <br /> MW-3R — 60 2 5 20 15 Proposed Replacement Well <br /> MW-SR — 60 2 S 20 15 Proposed Replacement Well <br /> MW-7R -- 60 2 5 20 15 Proposed Replacement Well <br /> MW-9R — 60 2 S 20 15 Proposed Replacement Well <br /> MW-10 — 20 2 5 20 15 Proposed Northern Offsite Well <br /> Explanation <br /> Wells are of PVC construction <br /> bgs=Below Grade Surface <br /> --=Not Available/Not Applicable <br /> Note: Proposed well depths and screens may change based on suburface conditions encountered during installation. <br /> 2133-Well-CompAs Page 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.