My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:09:00 PM
Creation date
2/6/2019 4:14:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
548
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron Compliance <br /> Page 2 <br /> In late May, Chevron submits a work plan for additional assessment and in late June <br /> four soil borings and a monitoring well are installed. In late September, Chevron <br /> submits a summary report and states that a corrective action plan to design and <br /> implement remedial actions would be submitted by 1/31/95. PHS/EHD responds in <br /> early November and directs Chevron to submit the corrective action plan by late <br /> December. In early December, Chevron responds that the corrective action plan <br /> would be submitted by December 30, 1994. Chevron also submits the third quarter <br /> 1994 report. <br /> 1995 In late January, Chevron requests an extension for the submittal of the corrective <br /> action plan until 5/15/95. In late September, Chevron submits the fourth quarter 1994 <br /> groundwater monitoring report, first quarter 1995, second quarter 1995 and the <br /> Geraghty and Miller work plan for Soil and Groundwater Remediation Services. In late <br /> November, PHS/EHD described to Chevron the problems with their compliance with <br /> regulatory directives, how the work plan failed to satisfy corrective action regulations, <br /> and that PHS/EHD did not agree with their proposed remediation goals. PHS/EHD <br /> stated that before goals less stringent than background were proposed, it must be <br /> demonstrated with physical data that the best available technology had been <br /> implemented and that any further remediation would not be technologically or <br /> economically effective for the benefit observed. A compliance schedule was also <br /> established and PHS/EHD indicated that should the schedule not be met that <br /> enforcement actions would be initiated. In early December, a meeting was held with <br /> Chevron and the following compliance schedule established: <br /> 12/23/95 Submit a drilling permit application, amended site map and a <br /> health and safety plan. <br /> 1/15/95 Submit a permit application to SJVUAPCD. <br /> 1/30/95 Submit a building permit application to the City of Stockton. <br /> 4/15/96 Start up interim remediation system <br /> 10/15/96 Submit a corrective action plan. <br /> In late December, Chevron submits the third quarter 1995 report. <br /> 1996 In early January, Chevron's consultant submits a drilling permit application to install air <br /> sparge and vapor extraction wells. In early July, PHS/EHD notifies Chevron that they <br /> are out of compliance. In late July, Chevron submits the fourth quarter 1995 <br /> monitoring report, first quarter 1996 monitoring report, a copy of the SJVUAPCD <br /> authority to construct permit, and the following amended compliance schedule: <br /> 8/9/96 Submit a building permit application to the City of Stockton and <br /> the second quarter 1996 monitoring report. <br /> 10/4/96 Begin drilling well/install system <br /> 11/29/96 Start-up interim remediation system <br /> 5/30/97 Submit a corrective action plan. <br /> In late August, Chevron's consultant faxes copies of the building permit application. In <br /> early October, PHS/EHD reviews the second quarter 1996 monitoring report and <br /> Chevron's phone message wanting to postpone remedial action. In early October, <br /> PHS/EHD forwards to Chevron a certified enforcement letter with the following <br /> directives: <br /> 10/21/96 Drilling must be initiated. <br /> 11/29/96 System constructed for operation. <br /> In late October, an administrative hearing is scheduled with Chevron, SJC District <br /> Attorney's Office, PHS/EHD and the Central Valley Regional Water Quality Control <br /> Rnarri fnr 1n/fid/9R <br />
The URL can be used to link to this page
Your browser does not support the video tag.