My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� ux -'•k.+��-"��e v.imd��'r4,.� maya.-.'x_.�.'�- '�'te- ^�a,— �mss•?r�y,�;a'.�# �� � _ � <br /> e <br /> s � <br /> Slil4 MARY REPORT <br /> CHEVRON SERVICE STATION NO. 9-4275 <br /> 2905 WEST BENJAMIN HOLT DRIVE <br /> STOCKTON,CALIFORNIA <br /> April 8, 1992 <br /> 1.0 INTRODUCTION <br /> This report is submitted as a summary of continuing environmental assessment work conducted at <br />�4 <br /> the Chevron service station number 9-4275 located at 2905 West Benjamin Holt Drive in Stockton,California <br /> (Figure i). The wort:was conducted during the quarter of January through March 1992, Work completed <br /> at the site Included quarterly groundwater monitoring and sampling,drilling and sampling three soil borings, <br /> and the installation of two groundwater monitoring wells (MW-6 and MW-7)and one vadose well (VW-1). <br /> 2.0 BACKGROUND <br /> In May 1990, Chevron retained Groundwater Technology,Inc. to Implement additional assessment <br /> at this site, Previous work performed In 1989,by other consulting firms,Included the removal of the original <br /> underground-storage tanks(USTs),performing a soil-vapor extraction survey,and the installation of five,on- <br /> site groundwater monitoring wells. <br /> 3.0 ADDITIONAL ASSESSMENT WORK <br /> 3.1 SITE-SPECIFIC HEALTH AND SAFETY PLAN/BACKGROUND REVIEW/PERMITTING <br /> Groundwater Technology prepared a Site-Specific Health and Safety Plan required by the <br /> Occupational Health and Safety Administration (OSHA) Standard "Hazardous Waste Operations and <br /> Emergency Response" guidelines (29 CFA 1910.120). The Site-Speciflc Health and Safety Plan was <br /> Prepared by a Groundwater Technology personnel,following a complete review of site conditions and any <br /> existing Site-Specific Health and Safety Plans for the site with the project manager. The document was <br /> 1 <br /> 22415uM1.Rpr <br /> I} GROUNDWATER <br /> TEci1'nu)(;y.l%,c, <br />
The URL can be used to link to this page
Your browser does not support the video tag.