My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
., z <br /> .,TMro <br /> � <br /> :. .x eo»�x � >d'�� '��r•+�V'S .,,.k. 3"� `.alt 'M.' .a �:*e.��`� � �2;x� ���.i <br /> t -'m <br /> a _ <br /> k y <br /> 0_. ''u�II�� GROUNDWATER d <br /> 71�� TECHNOLOGY INC. _ <br /> TECHNOLOGY, 140I Halyard Drioe,Suite 140,West Sacramento.CA 9569L(926)37'-4700 <br /> January 27, 1992 FAX[9103 2-878] <br /> Project No. 02320 2241 <br /> Mr. Clint B. Rogers <br /> Chevron U.S.A. Inc. <br /> 2410 Camino Ramon <br /> San Ramon, CA 94583-0804 <br /> RE: WORK PLAN ADDENDUM NO. 1 <br /> CHEVRON SERVICE STATION NO.9-4275 <br /> 2905 WEST BENJAMIN HOLT DRIVE <br /> STOCKTON, CALIFORNIA <br /> Dear Mr.Rogers: <br /> Groundwater Technology, Inc.pri?rants this addendum to the Work Plan for AdditionalAfonitoring <br /> Well Installation, Chevron Service Station No. 9-4275, 2905 W. Benjamin Holt Drive, Stockton, <br /> California, dated June 1990 (Attachment A). The original work plan proposed additional site <br /> assessment consisting of the installation of two groundwater monitoring wells, collection and <br /> analyses of soil and groundwater samples, and report preparation. The following items within the <br /> work plan will be amended: <br /> K The location of the monitoring wells <br /> u The frequency of soil sampling during drilling <br /> ■ The construction of the monitoring wells <br /> MONITORING WELL LOCATIONS <br /> Two off-site groundwater monitoring wells wilbbe installed to investigate the extent of dissolved- <br /> gasoline hydrocarbons to the west and east of the site. The approximate locations of the <br /> monitoring wells are shown on Figure 1. <br /> SOIL SAMPLING FREQUENCY AND MONITORING WELL CONSTRUCTION <br /> As stated in the work plan,the monitoring wells will be installed within soil borings which will be <br /> advanced to 30 feet below grade, using a truck-mounted drill rig equipped with! 8.5-inch outside- <br /> diameter JO.D,) hollow-stem augers. Instead of continuous coring, undisturbed soil samples will <br /> be collected at five foot intervals using a 2.5-inch-O.D.by 2-foot-long split-spoon core barrel. Each <br /> monitoring well will be constructed of 10 feet of 2-inch-diameter schedule 40 polyvinyl chloride <br /> w (PVC( casing and 20 feet of 0,020-inch well screen. A filter pack of No.2/12 lapis Lustre <br /> sand will be placed around the well from the bottorn to approximately one foot above the top of <br /> Offices throughout the U.S.,Canada and Ommeas <br />
The URL can be used to link to this page
Your browser does not support the video tag.