My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012551
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2905
>
3500 - Local Oversight Program
>
PR0544110
>
ARCHIVED REPORTS XR0012551
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2019 5:08:17 PM
Creation date
2/6/2019 4:29:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012551
RECORD_ID
PR0544110
PE
3528
FACILITY_ID
FA0003712
FACILITY_NAME
CHEVRON STATION #94275*
STREET_NUMBER
2905
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09760004
CURRENT_STATUS
02
SITE_LOCATION
2905 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
669
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> I ' <br /> GROUNDWATER TECHNOLOGY <br /> STANDARD OPERATING PROCEDURE. <br /> CONCERNING SOIL SM FLING MZTHODOLOGY <br /> r <br /> ° Sop 14 <br /> Soil samples should be collected and preserved in <br /> accca.dance with Groundwater Technology Laboratory's <br /> Str,..sdard Operating Procedure (GTL SOP 15) concerning <br /> Soil sample Collection and Handling when Sampling" for <br /> Volatile Organics. k hollow stem soil auger should be <br /> used to drill to the desired sampling depth. A standard <br /> 2 inch diameter split spoon sampler 16 inches in length <br /> shall be used to collect the samples. The samples are <br /> contained in 2 inch diameter by 6 inch long thin walled <br /> - brass tube liners fitted into the split spoon sampler <br /> (three per sampler) . <br /> The split spoon sampler should be driven the full dep-h <br /> of the spoon into the soil using L� 140 pound hammer,' <br /> The spoon shall then be extractr.d from the borehole and <br /> the brass tube liners containing the soil sample removed <br /> from the rampler. The ends of the liner tubes should be <br /> immediately covered With aluminum foil, sealed with a <br /> teflon or plastic cap, and then taped with duct tape. <br /> _ After being properly identified with sample data entered <br /> y on a standard chain of custody form the samples shall be <br /> placed on dry ice (maintair,E.:i below 4'C) and transported <br /> to the laboratory within 24 hours. <br /> Y <br /> One of the three soil samples retreived at each sample <br /> depth shall be analyzed in the field using a pocgnthe <br /> 7 nation detector and/or explosimeter. The purpose <br /> _l field analysis is to provide a means to choose Samples <br /> to be laboratory .analyzed for hydrocarbon concentrations <br /> and to enable comparisions between the field and <br /> f laboratory analyses. The soil sample shall be sealed in <br /> a plastic bag and placed in the sun to accelerate the <br /> vaporization of volatile hydrocarbons from the soil. One <br /> i <br /> of the two field vapor instruments shall be used to <br /> quantify the amount of hydrocarbon released to the air <br /> from the soil&F The data shall be recorded on the ointdrsll <br /> logs at the depth. corresponding to the sample p <br /> y <br /> EtG Ron,Dw-%TER <br /> TsCH��u�c�'.I�c <br /> r '� <br />
The URL can be used to link to this page
Your browser does not support the video tag.