Laserfiche WebLink
!, r <br /> SOIL VAPOR EXTRACTION SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> Dale J Time of Arrival <br /> Technician Time of Departure <br /> Site Engineer Rusty E Benkosky - - Was Site Engineer or substitute contacted from field? <br /> Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location en amin olt rive Stockton CA Station No Chevron#9-4275- Protect No 7Gb07-032-01-Task-1-- + <br /> Abatement Equip Kt%-lS is-i C — �zc) <br /> _ Serial No __-- <br /> SVE Blower S E/'(-Ut t6"6 l <br /> Max AMP Rating <br /> SPG Blowerr <br /> /� MAX AMP Rating � <br /> Telemetry '.&- <br /> Electrical Power oto Elect Meter Reading <br /> " - Supplemental Fua-6-- - Supp Fuel Meter Reading <br /> No of IVO barrels at site Full Empty <br /> • PART B SVE SYSTEM DATA <br /> System up or down upon arrival __ (If down please complete PART E) <br /> Hourmeter Reading At time <br /> Flow Data Before Ad ustment Final Ideal Range <br /> %Dilution air valve o n <br /> _ %Recirculation valve open <br /> IVO Content WO <br /> Vacuum @ blower(in H20) <br /> Gauge Range <br /> AMPS drawn by blowef motor AMPS <br /> Total System Flow(A P.in H20) <br /> Pope Size ' <br /> Well Field Air Flow(A P in H2O) <br /> 1 <br /> Pipe Size 4' <br /> Dilution Air Flow(A P,"H2O) <br /> --- <br /> Pipe Size <br /> il) <br /> FID Data WC CIDF WCIWOC/DF Ideal Range <br /> r <br /> S tem Influent my before dilution <br /> Sys <br /> tem Influent my after dilution <br /> System Effluent my <br /> Field Instrument Used Last Calibrated <br />