Laserfiche WebLink
O&M SITE VISIT PROCEDURES <br /> 1) Review request form at least 1 day before site visit so you can get clarification from the requester A short <br /> prefield meeting with the requestor to review non-standard requests is mandatory <br /> 2) Be sure that all equipment necessary to perform various tasks is loaded into the truck Test <br /> equipment for proper operation prior to leaving office equipment to complete the request <br /> 3) Inform the requestor in advance if you do not have all necessary parts and <br /> 4) If you are performing system monitoring be sure to complete the forms completely do not <br /> leave blank spaces Indicate "NA" if data to be collected do not apply to the site If you <br /> are unable to collect specrfic data call the requestor and get directions Never leave site - <br /> without obtaining necessary data or calling the requestor for directions <br /> 5) When collecting data, indicate data prior to system adjustment and at final selling Unless <br /> noteworthy or requested do not write down intermediary data <br /> 6) Get to know systems you work on intimately Carefully review manuals and instructions Additionally <br /> gel to know what our remediation goals consist of so you can more effectively operate the system <br /> 7) You are our eyes and ears therefore please indicate ANY system shortcoming or <br /> modifications that you believe will make the system operate more efficiently <br /> 8) Develop a sense for data that you collect' If you are gelling data which are unusually low <br /> or high check the gauge for accuracy and recollect the data CALL ENGINEER FROM <br /> • FIELD TO DISCUSS ABNORMAL DATA BEFORE YOU LEAVE THE SITE <br /> 9) Avoid writing derogatory remarks on the field data sheets Our client expects us to correct <br /> most problems during the site visit Develop a spare parts list for each site so we can take <br /> care of minor problems during the visit <br /> 10) If the system is experiencing problems that you cannot take care of as part of our regular <br /> ODM visit, call the Engineer Do not spend too much time (more than 112 hour) before <br /> calling the Engineer for consultation Be prepared to give the Engineer an estimate of <br /> - time and material it would take to fix the problem <br /> 11) When calling office to discuss field activities, be sure to talk to an ARCO engineering staff <br /> in person Ask the operator to page the person you need to talk to, and call alternate <br /> Engineers on the team if necessary <br /> 12) Check the hours allowed to complete a task prior to the field day Resolve differences <br /> prior to field day If additional time is needed to complete a task call the requestor or a <br /> substitute from the field to get authorization Be prepared to give a realistic estimate of <br /> additional time needed to complete the task from the field <br /> 13) Please turn in all field data sheets and chain-of-custody forms to the sampling coordinator <br /> within 24 hours of the field visit A field data sheet must be turned in for 2any field visit <br /> even if you are driving by and stop to check the system without the request' <br /> I <br /> 14) Have a camera handy so you can photograph system modifications or problems Turn in <br /> pictures to the Engineer as soon as they are ready J <br /> I <br /> I <br /> I <br />