7
<br /> iREFERENCES
<br /> Blaine Tech Services Inc. January 17, 1989 Cumulative Sampling Report, Chevron Service
<br /> Station no 4275, 2905 East Benjamin Holt, Stockton,California
<br /> July 24, 1991 Multiple Event Sampling Report 910626-C-1: Station onstruction,
<br /> Chevron Service Station No 94275, 2905 W. Benjamin Holt, Stockto C ornia.
<br /> June 13, 1997 Second Quarter 1997 Groundwater Monitore a evron ervice
<br /> Station Number 9-4275, 2905 West Benjamin Holt Drive, Stockton, Califo a
<br /> Earth Technology Corporation. November 1991 Conet, 29e
<br /> esting and BAT
<br /> Groundwater Sampling, Chevron Station No 9-42amen Holt Drive,
<br /> Stockton, California
<br /> Groundwater Technology, Inc. April 8, 1992. Summarvron Service Station
<br /> No 9-4275, 2905 W Benjamin Holt D Stockton, California
<br /> March 16, 1994 Problem Ass sm�eport/F ibility Study, Chevron Service
<br /> Station Number 9-4275, 2905 West nam o Drive, Stockton, California
<br /> March 24, 1994 Additional Asse me Report, Chevron Service Station No
<br /> 9-4275, 2905 W B gamin olt Drive, tockton, California
<br /> August 1 , 199 dditio Assessment Report, Chevron Service Station No
<br /> 9-4275, 2905 end in Drive, Stockton, California
<br /> Touchstone Developments ironmental Management. December 22, 1996 Product Piping
<br /> moval S Sampling Report, Chevron Service Station Number 9-4275, 2905 Benjamin
<br /> H D e, S ckton, California
<br /> We rn G o Resources, Inc February 28, 1989 Results of Soil Vapor Survey,
<br /> Ch vro tation#94275, Stockton, California
<br /> April 13, 1989 Results of Soil Boring and Sampling, Monitoring Well Installation,
<br /> and Groundwater Sampling,Chevron SS#94275, Stockton, California
<br /> Project No. RC0309 010
<br /> GERAGHTY&MILLER,INC ��
<br />
|